HDCS / HDCSM
6
HDCS
HDCSM
4.1
Hydraulic installation
Choose a location complying with the conditions required by applicable law.
.
If the boiler is located on a lower level than any of the heating water pipes, it is recommended to
fit shut-off valves to the flow and return pipes, to avoid having to drain the installation when
maintenance work is carried out on the boiler.
Before connecting the boiler hydraulically, thoroughly clean the pipes.
Remember to provide for a fill valve connected to the flow or return heating circuit.
4.2
Electrical installation
Ensure the voltage in the home is the same as that indicated for the boiler. Make the
electrical connections in accordance with the electrical diagrams shown in this manual.
The boiler must be installed by a qualified technician, observing the applicable legislation. It must
be connected to a heating circuit or domestic hot water network in accordance with its features
and power.
Feed gland
Feed gland
Thermostat Cable
Gland
gland
Thermostat cable
We recommend installing a main switch on the power lines enabling all supply phases to the
boiler to be cut off. A neutral phase is required to connect the boiler in 3phase 380v .
Содержание HDCS 10/15
Страница 26: ...HDCS HDCSM 24 NOTES ...