Fleck 5800 SXT Скачать руководство пользователя страница 16

PAGE 16

QualityWaterForLess.com

Help: 888-426-5001

8   ›I N I T I A L   S TA R T- U P

1)  With one nearby softened faucet running in the COLD position, slowly open your bypass valve or 3-valve 

bypass to about ¼ open to allow the air trapped in the softener to escape via your running faucet.  

NOTE: Opening the bypass too quickly or too open may damage your softener or plumbing

2)  Allow the softener tank to slowly fill with water. After a few minutes, you will see a trickle of water coming 

from the cold water faucet. Allow the water to run slowly in this manner for an additional 5 minutes. Next, 
with the cold water faucet still running, gradually move your bypass valve to the fully open position.  

NOTE: You may see some initial discoloration from the softened water – this is normal and 

should dissipate within the first 40-50 gallons of water used.

 Turn off the running cold water faucet 

when the water runs clear

› C O N G R AT U L AT I O N S

Your new softener with Fleck 5800 SXT Meter Valve is now properly in-
stalled and programmed! Please maintain your system by keeping the softener 
plugged-in and always keep your brine tank filled with salt to at least above 
the water level. We appreciate your business, and hope that you enjoy years of 
trouble-free softened water!

3) 

 

To test the integrity of your new system and all connections

,

 it is strongly encouraged that 

you perform a short form regeneration to check for leaks before service. 

Begin this process by 

adding approximately 5 gallons of water/the amount of water needed to cover the brine grid into the brine 
tank. Start the regeneration sequence by HOLDING the REGEN button for 5 seconds. Once the screen 
stops flashing BW, let BW - Backwash run for about 1 minute to observe the water leave out the drain 
line and check for leaks. If you notice any leaks, 

return to page 11

 to review preparing the drain connec-

tion. Click the REGEN button ONCE to move on to BD - Brine Draw

4)  Once the screen stops flashing BD, let BD - Brine Draw run for about 1 minute to observe the water 

level in the brine tank being drawn lower. Also check the brine line and the float valve in the brine well for 
leaks. If the water level doesn’t lower or there is a leak, 

return to pages 9 and 10

 to review preparing 

the brine tank connection. Click the REGEN button ONCE to move on to RR - Rapid Rinse

5)  Once the screen stops flashing RR, advance from RR - Rapid Rinse to BF - Brine Fill by clicking the 

REGEN button ONCE more. Once the screen stops flashing BF, let BF - Brine Fill run for about 1 minute 
to observe the water level in the brine tank rise. Also check the brine line and float valve in the brine well 
for leaks. If the water level doesn’t rise or there is a leak, 

return to pages 9 and 10

 to review preparing 

the brine tank connection. Click the REGEN button ONCE to finish

6)  Now you may add 120-160 pounds of pellet, solar, or block salt to your brine tank. 

Always keep your brine 

tank filled with salt to at least above the water level. 

You do not need to perform a regeneration im-

mediately after installation as the new resin arrives at full softening capacity. Simply let your softener meter 
automatically trigger regenerations by tracking the water consumption 

Содержание 5800 SXT

Страница 1: ...FLECK 5800 SXT METERED WATER SOFTENER INSTALL ATION GUIDE V1 0...

Страница 2: ...age 12 OU T L E T IN L E T DR AIN SE T TING INPU T VA LUE DF Display Format GAL Gallons VT Valve Type 5800 RF Regeneration Flow dF1b CT Control Type Fd Flow Delayed C UNIT CAPACITY 000 Grains H HARDNE...

Страница 3: ...ntrol Valve from QualityWaterForLess com We have put together these instructions as reference and to be used as general installation guidelines It is always recommended that a licensed plumber perform...

Страница 4: ...hardness level in PPM or mg L please divide this number by 17 1 to get Grains gpg Ex If your hardness is measured at 300 PPM take 300 17 1 18 gpg before iron 3 H COMPENSATED HARDNESS Your Iron result...

Страница 5: ...20K 10 Min 7 5 lbs Grid Grid NO GRID NO GRID 25 gpg 24K 14 Min 11 25 lbs Grid 3 Legs Grid Grid Grid 32K 1 0 cu ft 9x48 0 12 gpg 20K 8 Min 6 lbs Grid NO GRID NO GRID NO GRID TOO LARGE TOO LARGE 12 25 g...

Страница 6: ...IG U R E 6 A FIG U R E 6 B PRE INSTALL ATION Before assembly of your new system be sure that the following conditions have been met for the place ment of your system Level firm surface such as concret...

Страница 7: ...E 7 A FIG U R E 7 B 3 INSTALLING THE FLECK 5800 SX T VALVE 1 Remove the filling funnel and tape and while using the included silicone lubricant packet lu bricate the inner and outer o rings on the bot...

Страница 8: ...lines and use a wet rag on the lines being soldered to prevent heat damage during soldering 6 Once all connections have been made place the system into bypass by either using your existing 3 valve byp...

Страница 9: ...lso take this moment to prepare and insert the brine support grid determined from pages 4 and 5 Then pull the 474 Brine Float Assembly out of the brine well as shown in Figure 9 C 4 Next fix the 474 B...

Страница 10: ...e to recut the end of the tube each time you remove it to ensure a proper seal when the tube is inserted 8 Finally use inner diameter I D tubing to connect the drain barb fitting on the brine tank to...

Страница 11: ...ure 11 C Be sure that the fitting is fully inserted into the drain port by clicking it into place 4 Reinsert the drain fitting pin to lock the DLFC barbed drain fitting into the Fleck 5800 SXT con tro...

Страница 12: ...u may hold the button to allow the time to scroll faster Once the time display is set to 12 01 PM press the REGEN button once as shown in Figure 12 B 3 To enter MASTER PROGRAMMING MODE press the UP an...

Страница 13: ...your water listed on page 2 calculated on page 4 and press the REGEN button as shown in Figure 13 C 10 The display should now show RS SF as shown in Figure 13 D This indicates that the Reserve Select...

Страница 14: ...igure 14 A This indicates the system will regenerate at 2 00 AM following the day the water consumption has passed the calculated capacity If you prefer an alternate regeneration time please enter it...

Страница 15: ...wn in Figure 15 B This indicates Flow Relay Off Do not change this value and advance 21 The system will now exit Master Program ming mode and the display should now show the time of day followed by th...

Страница 16: ...of water needed to cover the brine grid into the brine tank Start the regeneration sequence by HOLDING the REGEN button for 5 seconds Once the screen stops flashing BW let BW Backwash run for about 1...

Отзывы: