www.flamcogroup.com
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products
.
Rev 8.1 Aug-15 Page
3
/
44
Commissioning Record
FILL IN RECORD TO VALIDATE WARRANTY OF PRESSURISATION UNIT
Site Reference:
PU Reference:
Date Commissioned:
/
/
Engineer Name:
Company:
COLD FILL:
Bar
FILL SYSTEM:
YES / NO Delete as appropriate
HIGH SET:
Bar
PUMPS NUMBER:
1 / 2
Delete as appropriate
LOW SET:
Bar
PUMP TYPE:
0 / 1
Delete as appropriate
DIFFERENTIAL:
Bar
PUMP SENSE:
YES / NO Delete as appropriate
FLOOD LIMIT:
Minutes
SENSOR TYPE:
0 / 1 / 2
Delete as appropriate
PUMP 1 COUNT:
SPC CONTROLLER:
NO
PUMP 1 HOURS:
GLYCOL UNIT:
NO
PUMP 2 COUNT:
ID NUMBER:
PUMP 2 HOURS:
RELAY
INVERSION:
YES / NO
Delete as appropriate
ALARM COUNT:
OVERUN:
POWER
INTERRUPTED:
PRESSURE ALARM AUTO RESET:
YES / NO
Delete as appropriate
PULSE:
YES / NO Delete as appropriate
EXCESSIVE START:
YES / NO Delete as appropriate
YES / NO Delete as appropriate
SERVICE:
YES / NO Delete as appropriate
YES / NO Delete as appropriate
Notes:
Commissioning certificate can be obtained please contact Flamco
representative
Engineer Signature:
Date:
/
/
Customer Signature:
Date:
/
/