www.flamcogroup.com
© 2014 Flamco group. All rights reserved.
We reserve the right to change designs and technical specifications of our products
.
Rev 8.1 Aug-15 Page
4
/
44
Contents
Customer & Equipment details
2
Commission Record
3
About this Manual
Where to find more Information
5
Equipment Overview
Principal of Operation
6
Installation
Pipe Connections
7
Typical Installation Diagram
7
Flow Restrictors (Midi & Mini models only)
8
Flexfiller Clearance and Connection Requirements
9
Midi Clearance and Connection Requirements
10
Mini Clearance and Connection Requirements
11
Electrical Power Supply
12
Fault Contacts
13
Commissioning
Pre-Commissioning Checklist
14
Controller Overview
15
Controller Programming
16
Program List
17 – 19
Hydraulic Commissioning
20 - 24
Operation
Fault Codes
25
Shutdown Procedure
26
Start-Up Procedure
26
Maintenance
Maintenance information
27 - 28
Wiring Diagram
29
Wiring Location
30
Spares
Electrical Items (All Models)
31
Flexfiller Models (125D, 225D, 150D, 250D, 280DS)
32
Midi Models (125D, 225D, 150D, 250D)
33
Mini Models (130D, 230D)
34
Troubleshooting
35 - 37
Service Log
38 - 39
Warranty Information
40