7

Installation of fire damper into rigid 

building elements (walls and inter-

mediate floors) with fire classification  

EI 90 / EI 120 (Fig. 5 and Fig. 8)

1.  Installation opening in the rigid wall or intermediate floor 

must comply with the dimensions given in the table be-

low. 

Installation of fire damper into flexible 

building elements (gypsum board walls 

or similar) with fire classification EI 90 

/ EI 120 (Fig. 6 and Fig.)

1.  Installation opening in the flexible wall must comply with 

the dimensions given in the table below. Make an open-

ing to the wall with beams.

2.  The fire damper blade must be closed during installation.  

NOTE! The blade supports may not be removed before 

completed grouting.

3.  Place the fire damper centrally in the opening. Fire 

damper positioning: 
a.  The fire damper must be placed so that the blade is cen-

trally inside the opening in the intermediate floor or wall. 

b.  The marking (1) on the actuator side shall align with 

the building element surface.

c.  The damper axle can be placed in any position (Ø100 

- Ø400) or in horizontal position when mounted in the 

wall (Ø500 - Ø1000).

d.  Ensure that fire damper casing remains in horizontal 

position during installation.

4.  Support the damper properly in the opening.  Fasten the 

damper with the angle brackets (2), 1-4 pcs depending 

on damper size. Use Ø5 mm screws suitable for rigid 

construction to lock the position. 

5.  Completely fill the gap M between the damper and the 

building element using incombustible, rock based, fine-

grained gypsum or concrete cast. Protect the damper 

whilst infilling. 

6.  Remove the blade supports (4) when finished grouting 

(Ø500 - Ø1000).

2.  The fire damper blade must be closed during installation.  

NOTE! The blade supports may not be removed before 

completed grouting.

3.  Place the fire damper centrally in the opening. Fire 

damper positioning: 
a.  The fire damper must be placed so that the blade is 

centrally inside the opening in the wall.

b.  The marking (1) on the actuator side shall align with 

the building element surface.

c.  The damper axle can be placed in any position (Ø100 

- Ø400) or in horizontal position when mounted in the 

wall (Ø500 - Ø1000).

d.  Ensure that fire damper casing remains in horizontal 

position during installation.

4.  Support the damper properly in the opening. Fasten the 

damper with the angle brackets (2), 1-4 pcs depending 

on damper size. Use Ø5 mm screws or anchors suitable 

for flexible construction to lock the position. Attach one 

additional gypsum board (5) to work as grouting sup-

port. 

5.  Completely fill the gap M between the damper and the 

building element using incombustible, rock based, fine-

grained gypsum or concrete cast. Protect the damper 

whilst infilling. Attach the other additional gypsum board 

(5). Fill the gap S between the fire damper and the gyp-

sum board on both sides by using fire-resistant mass, 

e.g. Silacoll 100. (Figure  7). 

6.  Remove the blade supports (4) when finished grouting 

(Ø500 - Ø1000).

Size ØD (mm)

Installation opening Ø (mm)

100

125

150

160

200

250

300

315

400

500

630

800

1000

185 – 205

185 – 205

210 – 230

220 – 240

260 – 280

310 – 330

360 – 380

375 – 395

460 – 480

560 – 580

690 – 710

860 – 880

1060 – 1080

Size ØD 

(mm)

Installation opening 

Ø (mm)

Gypsym plate dim. (mm) 

min. thickness 12,5 mm

100

125

150

160

200

250

300

315

400

500

630

800

225 x 225

225 x 225

250 x 250

260 x 260

300 x 300

350 x 350

400 x 400

415 x 415

500 x 500

600 x 600

730 x 730

900 x 900

405 x 405

405 x 405

430 x 430

440 x 440

480 x 480

530 x 530

580 x 580

595 x 595

680 x 680

780 x 780

910 x 910

1080 x 1080

Continue on page 8

Содержание ETCE

Страница 1: ...INSTRUCTIONS FOR INSTALLATION OPERATION AND MAINTENANCE Fire Damper ETCE and ETCS...

Страница 2: ......

Страница 3: ...et the mechanism turn the handle until the mechanism clicks The function testing interval is always determined separately for each building but testing must be carried out at least twice a year accord...

Страница 4: ...enance 4 Installation into building elements with fire classification EI 60 100 1000 M S 1 2 1 t t D D 3 3 4 4 2 Figure 1 500 1000 Remove the blade supports when installation is finalized Figure 2 Fig...

Страница 5: ...damper centrally in the opening Fire damper positioning a The fire damper must be placed so that the blade is centrally inside the opening in the wall b The marking 1 on the actuator side shall align...

Страница 6: ...igure 6 Figure 8 Figure 7 min 200 mm 200 mm t M 2 1 3 4 M M S 1 1 t t D D 4 4 3 5 5 2 2 3 t mm EI 90 S 126 EI 120 S 126 t mm EI 90 S 110 EI 120 S 110 t mm 100 400 500 1000 EI 90 S 120 140 EI 120 S 120...

Страница 7: ...ve the blade supports 4 when finished grouting 500 1000 2 The fire damper blade must be closed during installation NOTE The blade supports may not be removed before completed grouting 3 Place the fire...

Страница 8: ...nually with the tool be sure to release the damper back to the closed position before switching on power 10 Connect ducts to the damper according to the instruc tions provided by the designer and the...

Страница 9: ...d proper indication verified Electric specification Operating temperature 25 C 70 C 230 VAC 1 5 A max 1 Test button 2 Cover 3 Screws 4 Microswitch under cover 5 Handle Fire damper blade position open...

Страница 10: ...re 10 2 Remove the cover 2 and the two screws 3 Figure 11 3 Remove the microswitch 4 screws Figure 12 4 Turn the switch 4 over to the position shown in Fig 13 and fasten it with the screws 5 NOTE As t...

Страница 11: ...14 2 Remove the fuse part mounting screw 6 Figure 15 3 Holding the test button pull out the complete fuse part 7 Figure 16 4 Correctly install the new fuse part and fasten it with the screw 6 5 Test...

Страница 12: ...area We offer our customers innovative technologies high quality and outstanding performance supported by more than a century of accumulated industry experience The widest product range in the market...

Отзывы: