background image

FläktGroup 

DC_9503GB 20180817_R0

Specifications are subject to alteration without notice.

Fire Damper ETCE and ETCS - Instructions for Installation, Operation and Maintenance

3

Installation

Fire dampers ETCE and ETCS (with stainless steel casing) 

must be installed according to this installation manual, see 

pages 3-8.  

Operation and function testing

According to CE marking, a fire damper must always be 

equipped with a tripping mechanism based on  

temperature. Fire dampers can be delivered equipped with 

either a fuse mechanism or an actuator.
ETCE motorized fire dampers may additionally be linked to 

a smoke detection based tripping mechanism. A tripping 

system based on smoke detection is easy to install using 

FläktWoods’ FICO control and monitoring system. The FICO 

system can also be used for automatic function tests of fire 

dampers.
The function testing for the motorized damper can be per-

formed by cutting off the power supply by using the switch 

of the thermal trip connected to the motor. The spring 

should then close the damper. The function testing can also 

be done by means of the control and monitoring system 

FICO, either manually or automatically. The recommended 

automatic function testing interval for the motorized model 

is 48 hours.
The operation of the fuse mechanism is tested by  

pushing the red test button – the spring should close the 

blade. Beware of the reset handle as it will rotate rapidly 

during test operation. To reset the mechanism, turn the 

handle until the mechanism clicks. 
The function testing interval is always determined  

separately for each building, but testing must be carried 

out at least twice a year according to product standard EN 

15650:2010.

Maintenance

According to product standard EN 15650:2010, fire damp-

er installations and function are to be checked every six 

months (see example of check list beside).
WARNING! Never put your hands inside the damper while 

it is closing.
Clean the fire damper by means of a vacuum cleaner. Avoid 

chemical cleaning agents.

Spare parts

Actuator: see type specification on the actuator.
Fuse part ETFF-99-1
Fuse part replacement, see page 11.

Fire damper identifier
Date of inspection
Check actuator wiring for damage (where applicable) 
Check limit-switch wiring for damage (where applicable)
Check damper cleanliness and clean where necessary
Check the condition of blades and seals, rectify and report where 

necessary
Confirm the safety closure operation of the fire damper according 

to the manufacturer’s instructions
Confirm operation of damper to OPEN and CLOSE by use of the 

control system and physical observation of the damper, rectify and 

report where necessary
Confirm operation of OPEN and CLOSED limit-switches, rectify and 

report where necessary
Confirm that the damper is working as a part of the  

monitoring system (where applicable)
Confirm that the damper is left in its normal working position
NOTE! A fire damper is usually part of a larger system. As this is 

the case, the whole system should be checked to comply with the 

operation and maintenance requirements for the system.

Maintenance Check List:

Содержание ETCE

Страница 1: ...INSTRUCTIONS FOR INSTALLATION OPERATION AND MAINTENANCE Fire Damper ETCE and ETCS...

Страница 2: ......

Страница 3: ...et the mechanism turn the handle until the mechanism clicks The function testing interval is always determined separately for each building but testing must be carried out at least twice a year accord...

Страница 4: ...enance 4 Installation into building elements with fire classification EI 60 100 1000 M S 1 2 1 t t D D 3 3 4 4 2 Figure 1 500 1000 Remove the blade supports when installation is finalized Figure 2 Fig...

Страница 5: ...damper centrally in the opening Fire damper positioning a The fire damper must be placed so that the blade is centrally inside the opening in the wall b The marking 1 on the actuator side shall align...

Страница 6: ...igure 6 Figure 8 Figure 7 min 200 mm 200 mm t M 2 1 3 4 M M S 1 1 t t D D 4 4 3 5 5 2 2 3 t mm EI 90 S 126 EI 120 S 126 t mm EI 90 S 110 EI 120 S 110 t mm 100 400 500 1000 EI 90 S 120 140 EI 120 S 120...

Страница 7: ...ve the blade supports 4 when finished grouting 500 1000 2 The fire damper blade must be closed during installation NOTE The blade supports may not be removed before completed grouting 3 Place the fire...

Страница 8: ...nually with the tool be sure to release the damper back to the closed position before switching on power 10 Connect ducts to the damper according to the instruc tions provided by the designer and the...

Страница 9: ...d proper indication verified Electric specification Operating temperature 25 C 70 C 230 VAC 1 5 A max 1 Test button 2 Cover 3 Screws 4 Microswitch under cover 5 Handle Fire damper blade position open...

Страница 10: ...re 10 2 Remove the cover 2 and the two screws 3 Figure 11 3 Remove the microswitch 4 screws Figure 12 4 Turn the switch 4 over to the position shown in Fig 13 and fasten it with the screws 5 NOTE As t...

Страница 11: ...14 2 Remove the fuse part mounting screw 6 Figure 15 3 Holding the test button pull out the complete fuse part 7 Figure 16 4 Correctly install the new fuse part and fasten it with the screw 6 5 Test...

Страница 12: ...area We offer our customers innovative technologies high quality and outstanding performance supported by more than a century of accumulated industry experience The widest product range in the market...

Отзывы: