background image

9 | 

P a g e

 

 

OPERATION AND SERVICE 

 

It is recommended that the vent and drain valves be opened on a scheduled basis to permit the escape of 
entrapped air and accumulated water. 

Since there are no moving parts, maintenance is limited to an occasional rinsing of the cartridge using 
light fuel oil or detergent. This should be done in accordance with filter changes especially in heavy fuel 
oil. 

The head gasket should be carefully inspected for signs of damage or deterioration each time the housing 
is opened. We recommend the gasket to be lubricated with petroleum jelly prior to installation. 

Catalyst unit has no moving parts, no additives, no magnets, no electrical hook-ups, and is maintenance 
free whenever used in applications for light fuel oil lasting for years after initial installation.  

NOTE: 

Whenever there is an application for Heavy Fuel Oil (HFO) or any other similar fuel type, please go to page 
10 for catalyst maintenance instructions as per section ‘Core Cleaning Procedures’, and follow to page 11, 
section ‘Core Cleaning Plan’. 

 

 

Содержание Green Fuel Catalyst FHD-120

Страница 1: ...Patented Fitch fuel catalyst technology INSTALLATION MANUAL FUEL CATALYST FHD 70 TO FHD 120 FOR MARINE SYSTEMS Made in USA...

Страница 2: ...FHD 70 TO FHD 120 SERIES SAMPLE DRAWING 6 Models FHD 70 to FHD 120 6 INSTALLATION 7 Receiving instructions 7 Installation 7 Start up of catalyst 7 Sample installation drawing with bypass line 8 OPERA...

Страница 3: ...d is to have a few hand tools and close following to the instruction manual guide However it is essential to do the installation carefully and safely We recommend that you read the next few lines with...

Страница 4: ...fore opening the lid Bolt housing to flor as tipping may occur when lid is open The catalyst unit if improperly used can cause serious injury or death Ignoring safety rules risks creating a hazard to...

Страница 5: ...ctured with the highest quality materials and with greatest pride to offer you a superior in line housing for marine applications Features Specs 12 GA cold rolled steel Viton O ring seal 2 NPT Inlet a...

Страница 6: ...IES SAMPLE DRAWING Models FHD 70 to FHD 120 Models FHD 70 to FHD 120 have the same dimensions see the drawing below The only difference between them is in their weight which is due to the actual catal...

Страница 7: ...unit from the system when cartridge replacement is necessary Tighten housing with proper tension to seal housing on existing pipe or flange Note housing has been factory pressure tested to assure a le...

Страница 8: ...8 P a g e Sample installation drawing with bypass line FHD 70 to FHD 120...

Страница 9: ...carefully inspected for signs of damage or deterioration each time the housing is opened We recommend the gasket to be lubricated with petroleum jelly prior to installation Catalyst unit has no moving...

Страница 10: ...lp to remove caked on debris Rinse the housing and unit cover with a clean solvent and dry with soft lint free wiping cloths 6 Lightly lubricate the head gasket with vaseline or petroleum jelly and po...

Страница 11: ...e See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter C...

Страница 12: ...e Quarterly Catalyst shall be visually checked quarterly and any irregularities or deficiencies shall be followed up and be reported to the responsible engineer The checks shall be performed visually...

Страница 13: ...s please contact your local distributor Any variations from these instructions should also be pre approved by manufacturer www greenfuelcatalyst com info greenfuelcatalyst com Copyright 2019 Green Fue...

Отзывы: