background image

12 | 

P a g e

 

 

ROUTINE SAFETY CHECKS 

Daily basis 

Catalyst shall be visually checked daily, and any irregularities or deficiencies shall be followed-up and be 
reported to the responsible engineer. 

The checks shall be performed visually with due consideration of the following indicators: 

 

Leakages 

 

Other as applicable 

Quarterly  

Catalyst shall be visually checked quarterly, and any irregularities or deficiencies shall be followed-up and 
be reported to the responsible engineer. 

The checks shall be performed visually, and if applicable also mechanically with due consideration of the 
following indicators: 

 

Leakages 

 

Core cleaning plan 

 

Fittings 

 

Bolts 

 

Valves 

 

Gaskets 

 

Housing 

 

Other as applicable 

Other 

It is recommended to check the catalyst for any irregularities or deficiencies 30 minutes after the main 
engine has been started. 

 

 

Содержание Green Fuel Catalyst FHD-120

Страница 1: ...Patented Fitch fuel catalyst technology INSTALLATION MANUAL FUEL CATALYST FHD 70 TO FHD 120 FOR MARINE SYSTEMS Made in USA...

Страница 2: ...FHD 70 TO FHD 120 SERIES SAMPLE DRAWING 6 Models FHD 70 to FHD 120 6 INSTALLATION 7 Receiving instructions 7 Installation 7 Start up of catalyst 7 Sample installation drawing with bypass line 8 OPERA...

Страница 3: ...d is to have a few hand tools and close following to the instruction manual guide However it is essential to do the installation carefully and safely We recommend that you read the next few lines with...

Страница 4: ...fore opening the lid Bolt housing to flor as tipping may occur when lid is open The catalyst unit if improperly used can cause serious injury or death Ignoring safety rules risks creating a hazard to...

Страница 5: ...ctured with the highest quality materials and with greatest pride to offer you a superior in line housing for marine applications Features Specs 12 GA cold rolled steel Viton O ring seal 2 NPT Inlet a...

Страница 6: ...IES SAMPLE DRAWING Models FHD 70 to FHD 120 Models FHD 70 to FHD 120 have the same dimensions see the drawing below The only difference between them is in their weight which is due to the actual catal...

Страница 7: ...unit from the system when cartridge replacement is necessary Tighten housing with proper tension to seal housing on existing pipe or flange Note housing has been factory pressure tested to assure a le...

Страница 8: ...8 P a g e Sample installation drawing with bypass line FHD 70 to FHD 120...

Страница 9: ...carefully inspected for signs of damage or deterioration each time the housing is opened We recommend the gasket to be lubricated with petroleum jelly prior to installation Catalyst unit has no moving...

Страница 10: ...lp to remove caked on debris Rinse the housing and unit cover with a clean solvent and dry with soft lint free wiping cloths 6 Lightly lubricate the head gasket with vaseline or petroleum jelly and po...

Страница 11: ...e See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter Core Cleaning Procedures See Chapter C...

Страница 12: ...e Quarterly Catalyst shall be visually checked quarterly and any irregularities or deficiencies shall be followed up and be reported to the responsible engineer The checks shall be performed visually...

Страница 13: ...s please contact your local distributor Any variations from these instructions should also be pre approved by manufacturer www greenfuelcatalyst com info greenfuelcatalyst com Copyright 2019 Green Fue...

Отзывы: