13
CHEMPURE MANUAL
SECTION 4
INSTALLATION
4.4 OVERFLOW SAMPLER ASSEMBLY
To mount overflow sampler assembly, proceed
as follows:
1. Mount overflow sampler assembly on outer, right
side of reagent cabinet using four bolts provided.
See Figure 4-2
. (If using IF-100 In-Line Filter see
instruction sheet enclosed with filter for complete
installation instructions.)
2. Place ends of the air vent tubing and overflow
waste tubing into waste pipe.
3. Connect waste pipe to drain.
4. Supply sample stream to regulating/intake valve
with 1/4" tubing (plastic or steel) as follows:
a. Loosen and remove nut and compression fitting
from bottom of regulating intake valve.
b. Slide nut and compression fitting over end of
sample stream tubing.
c. Seat end of tubing in nipple of valve and secure
by firmly tightening nut.
4.5 ELECTRICAL CONNECTIONS
Electrical connections are made to and from the analyz-
er at the input/output panel, located on the left side of
the analyzer.
See Figure 3-9.
FIGURE 4-2
OVERFLOW SAMPLER ASSEMBLY
Содержание 180-1300-01
Страница 1: ...Chempure Series Continuous Flow Analyzers Instruction Manual P N 51 Chemp May 1997 Chempure...
Страница 9: ...3 CHEMPURE MANUAL SECTION 3 INSTRUMENT DESCRIPTION FIGURE 3 1 ANALYZER FRONT VIEW 2X...
Страница 44: ...38 CHEMPURE MANUAL SECTION 13 APPENDIX FIGURE 13 1 WIRING DIAGRAM SECTION 13...
Страница 46: ...40 CHEMPURE MANUAL SECTION 13 APPENDIX...