Installation Instructions
14.7.16
Kapitel/Chapter 7: Installation Instructions - Seite/Page 71
Fig. 7.13-1: Electrical installation - example
7.13.1 Installation PMGi inverter - See separate PMGi 5000 inverter manual
All electrical safety installations have to be made on board.
7.13.2 Power source selector
A power source selector switch must be installed between the generator (or if applicable, AC-Control box)
and the ship's electrical supply system. This switch must used to ensure that all AC consumers can be
switched off at once. This switch should also be installed to keep the generator and shore (grid) power
1
2
3
4
5
1. Generator
2. Electrical fuel pump DC
3. PMGi 5000 inverter
4. iControl panel
5. Starter battery DC
Содержание Panda 5000i PMS
Страница 88: ...Maintenance Instructions Seite Page 88 Kaptitel Chapter 8 Maintenance Instructions 14 7 16 ...
Страница 94: ...Generator Tables Seite Page 94 Kaptitel Chapter 9 Generator Tables 14 7 16 Fig 9 8 1 Diamensions ...
Страница 102: ...Tables Seite Page 102 Kaptitel Chapter 10 Tables 14 7 16 ...
Страница 126: ...Inverter Panda PMGi Seite Page 126 Kaptitel Chapter 11 Inverter Panda PMGi 14 7 16 Leere Seite Intentionally blank ...
Страница 148: ...Seite Page 148 Kapitel Chapter 13 General operation 14 7 16 Leere Seite Intentionally blank General operation ...
Страница 158: ...Seite Page 158 Kapitel Chapter 15 Maintenance 14 7 16 Leere Seite Intentionally blank Maintenance ...
Страница 160: ...Seite Page 160 Kapitel Chapter 16 Annex 14 7 16 Leere Seite Intentionally blank Annex ...