background image

31

terms & CondItIons of Warranty

Firebird products are designed and manufactured to give 
many years of trouble free service.

The terms laid down in the warranty must be adhered to

u

 Firebird provides a comprehensive, conditional 

warranty of 5 years on the boiler shell and 2 years 
on all other parts from date of installation, provided   
installation has occurred within 12 months from date 
of purchase.

u

  The 5 year boiler shell warranty consists of parts and 

labour for the first 3 years and parts only for years 4 and 
5.

u

 The warranty will only apply if the boiler is 

commissioned by an OFTeC registered or competent, 
qualified engineer and is serviced annually thereafter.

u

 Please ensure that the commissioning certificate 

within the Boiler Passport is fully completed by an 
OFTeC registered or competent, qualified engineer 
and is returned to Firebird within 28 days of complete 
installation and commissioning.  The Boiler Passport is 
included with every boiler and can also be completed 
online at the following link:

 http://www.firebird.ie/index.php/boiler-passport.html.

u

  Correct commissioning will ensure that your boiler is 

set to operate at its maximum fuel efficiency.

u

  Consumable components, the nozzles and the oil hose 

are excluded.

terms & CondItIons of Warranty 

1.  Warranty implies that the product shall be free 

from defective parts or workmanship for a period 
of warranty cover, which begins from the date of 
installation.

2.  all claims under the warranty programme must be 

within the time limits stated on the left.

3.  Installation and commissioning of the product must be 

in accordance with (a) instruction/technical manuals 
(b) all relevant standards and codes of practice.

4.  an OFTeC registered or competent, qualified engineer, 

using the correct installation and test equipment 
must carry out installation and commissioning.

5.  This warranty does not cover special, incidental or 

consequential damages, injury to persons or property, 
or any other consequential loss.

6.  Servicing of the boiler is to be carried out annually to 

maintain the manufacturer’s warranty.

7.  Firebird accepts no liability in respect of any defect 

arising from incorrect installation, negligence, 
fair wear and tear, misuse, alteration or repair by 
unqualified persons.

8.  Firebird will not accept any liability in respect of any 

defect occurring to the product due to limescale 
build-up and or low return water temperature.

9.  The warranty programme extends to reasonable 

labour costs eXCePT in the case of a 5 year warranty 
period whereby any valid claim made after 3 years 
will not include labour costs.

10.  Firebird’s prior authorisation must be obtained before 

examination or repair of the product takes place.

11. Firebird will examine all claims made under the 

warranty programme and for any claims that are 
deemed invalid, the costs incurred will be borne by 
the owner.

12. The warranty programme only applies where the 

product was used for normal domestic heating 
purposes.

13.  any defective part removed under any or all of the 

warranty programmes MUST be returned to Firebird.

14.  If this appliance is installed in a pressurised system, 

failure to correctly size the expansion vessel may 
damage the boiler and invalidate the warranty

15. a full set of warranty conditions and terms can be 

found on the Firebird website.

STATUTORY RIGHTS OF THE OWNER ARE NOT

AFFECTED BY THIS WARRANTY

11

Содержание silver Boilerhouse 15-20kW

Страница 1: ...g Boilers Technical Manual HEATING SOLUTIONS This manual must remain with the householder once installation is complete Working towards a greener planet Silverpac Slimline Silverpac Silver Boilerhouse...

Страница 2: ......

Страница 3: ...rpac 22 8 2 Slimline Silverpac 23 8 3 Silver Boilerhouse 24 8 4 Silver Utility 25 9 Wiring 9 1 Silverpac 26 9 2 Slimline Silverpac 27 9 3 Silver Boilerhouse 28 9 4 Silver Utility 29 10 Burner 30 11 Te...

Страница 4: ...let First Aid medical attention should be sought following eye contact or prolonged reddening of the skin The small quantities of adhesives and sealants used in the product are cured They present no k...

Страница 5: ...status lights not included in Silver Boilerhouse and Silverpac models Set at Max 80 C Set at Mid 70 C Set at Min 60 C Burner Lockout The boiler is factory fitted with a burner control box lockout safe...

Страница 6: ...12 A1 2014 BS EN 12831 2003 and the statutory requirements of the Building Regulations To ensure the highest standards of installation safety it is important that the boiler be installed in compliance...

Страница 7: ...g manuals and BS 7074 Part 1 EN 12828 2003 etc Please note following important points before commencing installation Installation Commissioning Boilers must be installed commissioned and serviced by a...

Страница 8: ...r the cleaning door This should be checked at regular intervals and cleaned during annual service The condensate line should be plastic and have a minimum diameter of 22mm dia have a fall from the boi...

Страница 9: ...re connecting the condensate pump Condensate PUMP kit is available as an optional extra Boiler Sealed Condensate Drain Condensate Drain Trap Lime Stone Chippings Free Draining Soil Soak Away 500mm Fig...

Страница 10: ...Cone Float Screw cap Seal Seal 1 Push screw cap into connector and screw onto socket 2 Place cone into frame and float into cone 3 Screw frame with cone and float into connector 5 Final assembly 4 Pus...

Страница 11: ...Q Q R Pressure Jet Location Appliance Burner Type Condensing UK ROI NI A Directly below an opening airbrick opening window etc 1000mm 600mm B Horizontally to an opening airbrick opening window etc 100...

Страница 12: ...to BS EN 303 1 5 Terminating positions must be at least 1 8m distant from an oil storage tank unless a wall with at least 30 minutes fire resistance and extending 300mm higher and wider than the oil s...

Страница 13: ...ired to ventilate and to avoid overheating in the boiler area OPEN FLUE BOILER IN ROOM BOILER COMPARTMENT VENTILATED FROM OUTSIDE BOILER COMPARTMENT VENTILATED FROM ADJOINING ROOM 55mm2 kW 55mm2 kW 55...

Страница 14: ...Balanced flue TOP mark Snorkel 1 Push the flap valve into the balanced flue air intake 2 Ensure that the flap valve is in the correct position 3 Push the snorkel hose over the flap valve and air inta...

Страница 15: ...LVERPAC SLIMLINE SILVERPAC FLUE Put the 90 flue terminal with the cone on the boiler Fix the guard plate to the boiler and then the guard to the boiler Heatpac boiler after installation Fig 1 Fig 2 Fi...

Страница 16: ...ate System 35 flexible liner suitable for condensing applications System 35 adaptor 500mm Adjustable length Boiler adaptor Condensing boiler Condensing boiler NOTE All brick chimney constructions must...

Страница 17: ...oil tight Soldered joints are not permissible Before connecting to the boiler always flush the complete oil supply line and ensure that oil supply is completely clean and free of any dirt or foreign m...

Страница 18: ...erly commissioned when first used u The boiler should be commissioned by an OFTEC registered or competent qualified engineer familiar with Firebird products u The installation certificate and the comm...

Страница 19: ...the chamber 3 Clean the inside of the boiler with a vacuum cleaner 4 Refit all the baffles and the condensate trap securely 5 System pressure should not exceed 2 bar at full operating temperature The...

Страница 20: ...S 7074 Part 1 BS 5449 OFTEC standards and all other relevant legislation Preset Pressure Relief Valve 2 bar Water Side Resistance 15 20kW 20 26kW 26 35kW Flow Rate To Give A Nominal Output At 10K Diff...

Страница 21: ...d all other relevant legislation Preset Pressure Relief Valve 2 bar Water Side Resistance Flow Rate To Give A Nominal Output At 10K Differential Flow Rate Measured 2135 kg h Waterside Resistance 0 18...

Страница 22: ...ive A Nominal Output At 10K Differential Flow Rate Measured 1642 kg h 2135 kg h 2874 kg h Waterside Resistance 0 18 mbar 0 18 mbar 0 18 mbar Flow Rate To Give A Nominal Output At 20K Differential Flow...

Страница 23: ...W Flow Rate To Give A Nominal Output At 10K Differential Flow Rate Measured 1642 kg h 2135 kg h 2874 kg h Waterside Resistance 0 18 mbar 0 18 mbar 0 18 mbar Flow Rate To Give A Nominal Output At 20K D...

Страница 24: ...1 Condensate hose 111537 111537 111537 9 1 Drain cock 111329 111329 111329 10 1 Heat deflector 210904 210904 210904 11 1 Flap valve adapter 114262 114262 114262 12 1 Flap valve 114192 114192 114192 13...

Страница 25: ...ket 111317 7 1 Condensate trap 112184 8 1 Condensate hose 111537 9 1 Drain cock 111329 10 1 Heat deflector 210904 11 1 Flap valve adapter 114262 12 1 Flap valve 114192 13 1 Flue kit 411482 14 1 Contro...

Страница 26: ...Flue gasket 112104 112104 112104 6 1 Stat pocket 111317 111317 111317 7 1 Condensate trap 112184 112184 112184 8 1 Condensate hose 111537 111537 111537 9 1 Drain cock 111329 111329 111329 10 1 Heat de...

Страница 27: ...317 111317 7 1 Condensate trap 112184 112184 112184 8 1 Condensate hose 111537 111537 111537 9 1 Drain cock 111329 111329 111329 10 1 Heat deflector 210904 210904 210904 11 1 Air hose 111902 111902 11...

Страница 28: ...hermostat Reset pin inside Screw off cover Temperture control dial Max 80 C Min 60 C IMIT dual thermostat Pump live Earth Neutral Permanent live Timed Switch live Neutral Earth Pump over run thermosta...

Страница 29: ...e provided for with terminal connections in the control panel Use heat resistant cable Protect supply with 5A fuse Power to burner High temperture limit thermostat Reset pin inside Screw off cover Tem...

Страница 30: ...ids and covers are properly replaced and secured correctly 4 A permanent power supply not timed should be available at boiler location This can be used for a frost thermostat and or an over heat therm...

Страница 31: ...h temperture limit thermostat Reset pin inside Screw off cover Temperture control dial Max 80 C Min 60 C IMIT dual thermostat L1 switch live Pump over run thermostat 87 C L2 remote lockout lamp Please...

Страница 32: ...Danfoss S H nozzles are a Diesel nozzle and have a tolerance of 15 when used with Kerosene KEROSENE SETTINGS FOR FIREBIRD BOILER RANGE USING RDB 2 2 BURNERS Variations in nozzle throughput flue type...

Страница 33: ...accordance with a instruction technical manuals b all relevant standards and codes of practice 4 An OFTEC registered or competent qualified engineer using the correct installation and test equipment...

Страница 34: ...ergy Consumption Sound Power Level kW GJ dB SILVERPAC 15 20kW A 20 92 50 N A 20 26kW A 26 92 72 N A 26 35kW A 35 92 95 N A SLIMLINE SILVERPAC 20 26kW A 26 92 72 N A SILVER BOILERHOUSE 15 20kW A 20 92...

Страница 35: ......

Страница 36: ...contact Firebird Heating Solutions Ltd dar s Industrial Estate Baile Mhic re Co Cork P12 HK51 Ireland t 353 0 26 45253 f 353 0 26 45309 e info firebird ie web www firebird ie Firebird Heating Solution...

Отзывы: