Firebird
Installation & Operation Manual
14
• The foundation drawing shown previously is an example.
• The unit is low-vibration model, but consider using some floor
reinforcement or anti-vibration mat / rubber when vibration
should occur due to weakness of attached surface.
• The foundation shall be unified with the floor slab. If not,
calculate the vibration proof of the installation of Enviroair
Unit as well as of the Enviroair Unit with the foundation in
order to ensure strength against a fall or for when the unit
has to be moved.
• Drain water and rainwater are discharged from the bottom of
the unit when in operation as well as when stopped.
• Choose a location with good drainage or place a water drain
as in the drawing.
• Make the foundation flat and waterproof, as a water pool may
appear in case of, for instance, rain.
• This is a low-profile product with a shallow depth. It may also
be able to fix on the wall as shown below when fixing only
with the foundation bolt does not seem sufficiently stable
depending on the conditions of the installation (metal fittings
must be field supplied).
Fix unit to the wall
1 Fix the unit onto the wall as indicated in the figure
(stay field supplied).
2 The foundation shall be strong enough to avoid any
deformation and vibration.
3 In order to prevent vibration transfer to the building, place
rubber material between the stay and the wall.
CAUTION
Pay attention to the following for installation:
• Installation shall ensure that unit will not incline, vibrate, make
noise or fall down by a blast of wind or in an earthquake.
Calculate quake resistance strength to ensure that installation
is strong enough against falling. Fix the unit with wires
(field supplied) when installing in a location without walls or
windbreak and likely exposed to a blast of wind.
• Apply vibration-proof material where necessary.
Installing location where the unit will
be exposed to strong wind
Strong winds against the unit’s air outlet causes short circuits
and these can be the consequences:
• Lack of air flow and adversely affect to normal function.
• Frequent frost acceleration.
• Fan can rotate very fast until it breaks.
Follow the instructions below to install on a rooftop or a location
without surrounding buildings, where strong wind is expected
against the unit.
1 Choose a location where the outlet or inlet side of the product
will not be exposed to strong wind.
2 In case the fulfillment of point 1 is not possible, it is
recommended to use the optional parts.
CAUTION
Excessive strong wind against the unit outlet may cause inverse
rotation and damage the fan motor.
7. Refrigerant and Water Piping
• Prepare locally supplied copper pipes.
• Select the piping size with the correct thickness and correct
material able to withstand sufficient pressure.
• Select clean copper pipes. Make sure that there is no dust
or moisture inside the pipes. Blow the inside of the pipes
with oxygen free nitrogen to remove any dust and foreign
materials before connecting them.
7.1 General Notes Before Performing Piping Work
NOTE
A system with no moisture or oil contamination will give
maximum performance and life cycle compared to that of a
poorly prepared system. Take particular care to ensure that all
copper piping is clean and dry internally.
Содержание Enviroair 11kW
Страница 1: ...SUPERIOR HEATING SOLUTIONS SINCE 1980 Installation Operation Manual...
Страница 2: ...Firebird Installation Operation Manual 2...
Страница 9: ...9 5 General Dimensions Enviroair 11 16kW Enviroair 7 5kW 5 1 Service Space...
Страница 54: ...Firebird Installation Operation Manual 54 Notes...
Страница 55: ...55...