background image

71-0163 

Page 14 

4215-138 

Rev. 01 

 

09/07/2021 

INTERIOR INSTALLATION 

 
49.

 

Install door handle so the handle with the predrilled holes is inside the room. Secure 
handle with two screws provided within the handle package and cover screw heads with 
wooden buttons.   

 
 
 
 
 
 
 
 
 
 
 
 
50.

 

Place upper bench on the upper bench supports. Rest the bench upward for 
easier installation of the lower bench.  
 

 

51.

 

Place lower bench on the lower bench supports. Lower upper bench into 
place. 
 

 
52.

 

Secure upper bench with two 3” screws through the framework into the 
backwall and one 3” screw into right and left sidewalls.  
 
 
Note: Do not secure the lower bench, as it is designed to slide back out of the 
way for ease of cleaning.  

 

 
 

53.

 

Place duckboard (floorboard) on floor in front of the lower bench.  

 
 
 
 
 
 
54.

 

Connect the wires from the back of the backrest to the wires from the back wall. Install the backrest 
to the back wall through the predrilled holes (standard height is 20” from top of bench to top of 
backrest). Install wooden buttons over screws.  

Содержание NorthStar NS 44

Страница 1: ...44 with SL2 Control and CB 13 1 and Bluetooth Sound Sytem Optional Precautions Before Use 2 Read Before Installation 2 Room Summary 3 Room Assembly 4 Electrical Installation 8 Sound Bar Installation...

Страница 2: ...s several degrees above the normal body temperature of 98 6 F The symptoms of hyperthermia include an increase in the normal temperature of the body dizziness lethargy drowsiness and fainting The effe...

Страница 3: ...r between models Torx Bit 9 x 2 Wood Screw 9 x 3 Wood Screw Window Door Casing normally pre installed Inside Cove Molding Exterior Fascia Trim Eve Trim Exterior Cove Molding Fascia Trim Ceiling Panel...

Страница 4: ...rilled holes are purposely made at an angle Note The base must be level before installing wall and ceiling panels If the surface is not level you may need to shim the floor panel to get it level The b...

Страница 5: ...all one screw on the top of the wall one in the middle and one on the bottom Ensure the tongue and groove wall boards are tight together at the interior corner of the sauna and the corner is flush on...

Страница 6: ...s ensure all panels are connected together on top and on the corners 9 Secure top plates using the 2 Torq screws Install one screw in each corner and one screw in the center of each wall 10 Install co...

Страница 7: ...ack wall so it is flush to the left and right edges of the wall Note The fascia top should be flush with the top of the wall panel 14 Install fascia to the side walls so it is flush to the back fascia...

Страница 8: ...cuit device is not required by NEC A GFCI may be installed if required by local codes but will nuisance trip during use of the product CAUTION Loose wire connections can cause heat damage to wires ter...

Страница 9: ...he top back of heater 28 After removing the screws for the rock grill the mounting bracket will be loose from the heater 29 Secure the sauna heater mounting bracket to wall brackets using the in predr...

Страница 10: ...cluding the ends Place larger rocks loosely in middle of heater Fill the heater until flush with the top of the outer shroud Add 3 to 4 large rocks to top of heater Note There will be extra rocks prov...

Страница 11: ...nsure all electrical connections are installed and everything is safe 44 Apply power to the heater The control will flash for about 15 seconds as it is booting up 45 Press the room light button to ens...

Страница 12: ...d Bar It is recommended that you mount the sound bar off the sauna floor Attach the wooden cleat as shown in Diagram B with the bevel facing up using the 2 Torx bit screws The best sound will be achie...

Страница 13: ...the volume keys on your smart device to adjust volume on the SL2 Sound Bar All control functions are through your smart device and music App WARRANTY TyloHelo Inc will warranty the SL2 Sound Bar for...

Страница 14: ...he lower bench supports Lower upper bench into place 52 Secure upper bench with two 3 screws through the framework into the backwall and one 3 screw into right and left sidewalls Note Do not secure th...

Страница 15: ...itself off and the control display will turn off SETTING THE TIME AND TEMPERATURE To set the sauna length time press the icon and then press the or icons to increase or decrease time for desired setti...

Страница 16: ...k with any other device manufactures for operation temperatures before using the device in the Sauna IR Room USER MAINTENANCE INSTRUCTIONS Room Instructions for Cleaning Perspiration and dirt may abso...

Страница 17: ...d to the CB or the temperature is below 8 F Prior to calling please have the Model Type Number and Serial Number from room available If you have any questions during the installation of your sauna ple...

Отзывы: