19
F. Disengage (turn off) the clutch, idle the engine, move discharge valve handle to discharge
position, move agitator handle to neutral and turn off the engine. (Remember to replace the
coupler gasket).
G. Always remove the drain plug and allow the tank to drain.
H. In freezing weather leave main tank drain plug out and remove pump drain plug. Move all
slurry valves to open position.
I. Wash the outside of the HydroSeeder® to remove any corrosive materials.
2. Lubricating the HydroSeeder® (see lube chart pages 20-21).
IMPORTANT:
Lubrication should be performed IMMEDIATELY AFTER cleaning
of equipment. Engine not running.
A. Lubricate the agitator shaft bearings located on the outside front and rear of the slurry-tank.
B. Service the automatic lubricator on the pump as needed (for service see page 9).
C. Check engine oil and replenish if necessary. Change oil and filter after first 5 hrs then 100
hrs thereafter. Check engine manual for correct grade of oil and engine break-in procedure.
D. Lubricate the swivel on the discharge boom assembly (platform option only).
WEEKLY OR EVERY 40 HOURS OF OPERATING TIME:
1. Clean the air cleaner following the instructions in the engine operator’s manual.
2. Lubricate all the points on the HydroSeeder® as outlined in the daily maintenance section and, in
addition, lubricate the two grease fittings on the clutch/pump.
3. Check the level in the hydraulic oil reservoir - maintain level with dipstick on filler cap.
4. Inspect the slurry-tank for build up of residue in the suction area and clear if necessary.
SEASONAL AND WINTER STORAGE MAINTENANCE:
1. Drain the slurry tank of all water prior to storage and leave the drain plug disconnected.
2. Park unit in suitable location and chock wheels to prevent inadvertent movement.
3. If possible cover machine with tarp or park inside of an enclosure.
4. Store the HydroSeeder® with all slurry valve handles in the open position. To prevent damage from
freezing, it is advisable to remove all slurry valves and store in a heated area.
5. Pour one quart of mineral oil or environmentally safe lubricant into the pump housing and spin pump
by hand to prevent rust in the pump. Remove drain plug.
6. Chip and steel brush any interior rust spots in the slurry-tank and touch up with paint. See numbers
2 and 3 in Maintenance Section (IV) of the Safety Summary Section page 4.
7. Lubricate all fittings.
8. Lubricate equipment again just prior to starting operation after storage.
9. Change hydraulic oil and filter. (400 hours)
10. Disconnect battery cables. In cold weather, remove battery and store in safe warm place.
11. Add fuel stabilizer to fuel tank.
Содержание HydroSeeder T75
Страница 2: ......
Страница 35: ...29 NOTES 29...
Страница 36: ...30 NOTES 30...
Страница 37: ...31 T75 Hydroseeder Parts Manual Model SR...
Страница 52: ...LBT75 SR Rev A 46 WHEN ORDERING PARTS BE SURE TO STATE SERIAL NUMBER OF MACHINE 10 10 9 7 6 3 4 5 8 2 1 11 12...