PM 1 Installation and Operating Manual v1.2
32
FilterSense © 2016
8 Functional Verification
To verify operation after commissioning or otherwise as needed, the following 3 checks should be performed:
1.
2.
3.
As needed the device can be returned to the factory for full electronics testing and mechanical
checkout.
8.1 Power-Up Check
A Power-Up Check can be initiated to check the general functionality of the particulate monitor. The check
occurs each time the instrument is powered up. A failed status result will remain until power is cycled and the
error has cleared. Follow the steps below to run a Power-Up Check:
Power-Up Check Procedure
1.
Cycle power to the PM 1.
2.
If ERR 1 or ERR 2 is displayed on the digital
readout, follow the steps outlined in the
section of this manual.
8.2 System-Zero Check
A System-Zero Check is an in situ (fully installed) test of the entire system when there is no airflow. A System-
Zero Check confirms proper installation and zeroing of the electronics and sensing probe when fully installed.
System-Zero Procedure
1.
Shut down the process and fan. Ensure process flow has completely stopped. The slightest amount of
flowing particles can create a signal.
2.
Monitor the particulate reading for a system zero.