against cement dust, convenient work clothes and shoes, work gloves). Workmen 
are obliged to do daily notes into the operating diary. 
 

 
Safety instruction concerning: 

 

-

 

Assembly and the installation – Assembly of the machine is carried out at the 
producer and the transport to the client is performed in already assembled form 
of  the  machine.  The  check  of  the  machine  integrity,  complexity  of  the 
equipment  of the machine is  performed in  the place of operation. Machine is 
switch to the electrical supply and to the compressed air supply after setting to 
the place of application. 

 

-

 

Setting  to  the  operation  –  Machine  and  its  accessories  must  be  appropriately 
assembled  before  setting  to  the  operation.  All  necessary  assembly  and 
following  checking  operation  steps  must  be  carried  out  according  to  the 
Operation and Maintenance Manual provided by the producer.  

 

-

 

Operation of the machine – Machine must be used only in accordance with the 
Operation  and  the  Maintenance  Manual  provided  by  the  machine  producer. 
Machine  is  operated  by  one  operator  who  is  responsible  for  the  faultless 
conditions of the machine at the same time.  

 

-

 

Manipulation  –  Machine  can  be  transported  by  the  suitable  transport  means 
defined by the site manager. Total weight of the machine is 470 kg (DUO)/560 
kg  (COM-V)  with  tolerance  ±  5  %.  Each  machine  is  equipped  with  catching 
loops  for  the  connection  to  lifting  machine.  Manipulation  must  be  careful 
without any dynamic crashes. 

 

-

 

Assembly and disassembly – Disassembly of the hoses is done in case of each 
transfer  to  the  other  operation  place  Transfer  of  the  machine  in  assembled 
mode  is  done  by  mechanical  transport  means  (crane  truck,  truck).  It  is 
necessary so that there is no pressure of the compressed air in the machine as 
well as the switch off the electric supply is done before any disassembly of the 
machine.  

 

-

 

Adjustment  –  It  means  setting  up  according  to  the  Operation  and  the 
Maintenance Manual.  Simple steps  without any influence to  the safety  of the 
equipment  must  be  done  by  the  operators  according  to  the  local  conditions. 
Other  procedures  must  be  left  to  the  specialised  service  according  to  the 
Operation and the Maintenance Manual.   

 

-

 

Maintenance – small and operational steps are done by the operators according 
to  the  time  order  in  the  Operational  Manual.  Procedures  requiring  higher 
specific  knowledge  are  done  by  the  authorised  service  agencies  for  those 
machines.   

    

Содержание SSB 05.1 DUO

Страница 1: ...ying Machine SSB 05 2 Series PRODUCER FILAMOS s r o Hate 546 261 01 Pribram Czech Republic Tel 420 318 637 763 Fax 420 318 624 181 www filamos com User Manual Concrete Spraying Machine SSB 05 1 DUO SS...

Страница 2: ...hine Operating 3 IV Description 6 V Technical Data 8 VI Accessories 10 VII Material 10 VIII Executions 10 IX Markings 11 X Testing 11 XI Delivery 12 XII Warranty 12 XIII Packaging 12 XIV Transport 12...

Страница 3: ...walls cooling towers water reservoirs sewerage plants etc during the construction and reconstruction of buildings and during the reinforcement and bracing of tunnel vaults and sewers The machine is de...

Страница 4: ...onditions of the machine at the same time Manipulation Machine can be transported by the suitable transport means defined by the site manager Total weight of the machine is 470 kg DUO 560 kg COM V wit...

Страница 5: ...han 18 years with theoretical and practical skills qualified to operate the machine Other Ways of Use The Machine cannot be used for any other purpose than transport of dry concrete mixes fire resista...

Страница 6: ...des The dozing drum is fixed on the top part of the bearing part shaft by a square end and tightening nut The Machine head is installed on the 4 tightening bolts The sealing plate is mounted on its bo...

Страница 7: ...take is situated on the cover side The whole Machine is placed on the frame with bantam wheels Alternatively can be used a solid frame or a rail undercarriage Working Principle The concrete spraying m...

Страница 8: ...tor revolutions 8 12 rpms min Performance parameter Parameter Rotor 1 9L Rotor 3 9L Rotor 6 9L Drum volume dm3 1 9 3 9 6 9 Drum rpm min 1 8 12 8 12 8 12 Theoretical output m3x h 1 0 8 1 2 1 8 2 7 3 3...

Страница 9: ...ax 100 Mains connection 3x400 V TN S Max deviation of voltage system 10 Coverage IP 55 The transporting distance and height are directly affected by The composition and water content of the conveyed m...

Страница 10: ...sealing plate 3 pcs Nozzle ending 2 pcs The set of accessories can be adjusted according to the customer s requirements length of hoses number of sealing plates etc VII Material The material used in...

Страница 11: ...ut rated voltage weight of machine Electric motor and gearbox have their own rating plates X Testing The properties of the machine are checked in the manufacturing plant by means of a functional test...

Страница 12: ...en changed modified or repaired without the manufacturer s previous consent If the machine has been damaged by incorrect electrical connection If the product has been damaged by a third person or vis...

Страница 13: ...following Standards have been used Directive of the European Community No 98 37 ES Mechanical Equipment Basic Requirements according to Appendix No 1 to NV 24 2003 Sb Czech National Standards SN EN I...

Страница 14: ...romagnetic valve 11 Main Air source 12 Automatic lubrication system 13 Electric energy connection 14 Remote control connection 15 Controlbox 16 Air vibrator 17 Hopper Optional components such as frequ...

Отзывы: