
TWINFLEX
®
pro² Control Panel Engineering and Commissioning Manual
49
This active control will allow the engineer to view or change the
operation of programmable input 2. Use the
UP
and
DOWN
arrow keys
to toggle through the following options. To confirm the changes press
ENTER.
1. CONTROL EVENT –
Operation of I/P 2 will operate a
control function on the panel.
2. REMOTE FIRE EVENT–
Operation of I/P 2 will signal a remote
fire input at the control panel. Panel
outputs will be triggered and fire
indication will be shown at the control
panel.
3. TECHNICAL EVENT –
Operation of I/P 2 will signal a
technical event at the control panel.
Panel outputs will be triggered but the
control panel will read technical alarm
and no fire indication will be given.
4. DISABLEMENTS –
Operation of I/P 2 will activate a
disablement on the control panel.
5. DAY-NIGHT MODE –
Operation of I/P 2 will activate the day
mode on the control panel
(TWINFLEX
®
Multipoint devices will
be disabled; TWINFLEX
®
ASD
devices will be disabled for smoke
only but not for heat).
6. PROGRAM I/P 2 OFF –
I/P 2 will not be active.
This active control will allow the engineer to view or change the
operation of the control event set for programmable input 2. Use the
UP
and
DOWN
arrow keys to toggle through the following options. To
confirm the changes press
ENTER.
1. SILENCE ALARMS –
Operation of I/P 2 will silence the
alarms.
2. RESET SYSTEM –
Operation of I/P 2 will reset the panel.
3. SOUND ALARMS –
Operation of I/P 2 will send the
evacuate signal to the panel.
4. SILENCE BUZZER –
Operation of I/P 2 will silence the
control panel buzzer.
10. Panel I/O
2. Programmable I/P 2
1. Input Type
01/09/09 20:13 ENGR
1.CONTROL EVENT
2.REMOTE FIRE EVENT
Press Enter Key
10. Panel I/O
2. Programmable I/P 2
1. Input Type
1. Control Event
01/09/09 20:13 ENGR
1.SILENCE ALARMS
2.RESET SYSTEM
Press Enter Key
www.acornfiresecurity.com
www.acornfiresecurity.com