
Triangle Tube’s ProtoNode Startup Guide
Page 32 of 40
ProtoCessor
1991 Tarob Court Milpitas, California 95035 USA
Web
Note: The lid on top of the ProtoNode has to be removed in order to select the A Bank of DIP switches. Pull on
the lid while holding on to the 6 pin Phoenix connector. Please do not hold the wall mount tabs as these are
designed to break off if not required!
•
To select these configurations, open the ProtoNode and set the A bank of switches (A1 or A2 or A3) on the
small ProtoCessor module that sits on top of the ProtoCarrier (inside the ProtoNode).
•
ProtoCessor A1 DIP switch starts on the bottom of the A bank of DIP switches below.
•
ProtoCessor A3-A8 DIP switches are disabled.
A1, A2, and A3 DIP Switches
Switches
N2 and Modbus TCP
ProtoCarrier DIP Switches
ProtoCessor DIP Switches (Remove Cover)
Profile -
FPC-N34-103-122-0676
S0
S1
S2
S3
A1 A2
A3
A4
A5
A6
A7
A8
1 Prestige to Metasys N2
Off
Off
Off
Off
On Off Off Off Off Off Off Off
2 Prestige to Metasys N2
On
Off
Off
Off
On Off Off Off Off Off Off Off
3 Prestige to Metasys N2
Off
On
Off
Off
On Off Off Off Off Off Off Off
4 Prestige to Metasys N2
On
On
Off
Off
On Off Off Off Off Off Off Off
5 Prestige to Metasys N2
Off
Off
On
Off
On Off Off Off Off Off Off Off
6 Prestige to Metasys N2
On
Off
On
Off
On Off Off Off Off Off Off Off
7 Prestige to Metasys N2
Off
On
On
Off
On Off Off Off Off Off Off Off
8 Prestige to Metasys N2
On
On
On
Off
On Off Off Off Off Off Off Off
1 Keystone to Metasys N2
Off
Off
Off
On
On Off Off Off Off Off Off Off
2 Keystone to Metasys N2
On
Off
Off
On
On Off Off Off Off Off Off Off
3 Keystone to Metasys N2
Off
On
Off
On
On Off Off Off Off Off Off Off
4 Keystone to Metasys N2
On
On
Off
On
On Off Off Off Off Off Off Off
5 Keystone to Metasys N2
Off
Off
On
On
On Off Off Off Off Off Off Off
6 Keystone to Metasys N2
On
Off
On
On
On Off Off Off Off Off Off Off
7 Keystone to Metasys N2
Off
On
On
On
On Off Off Off Off Off Off Off
8 Keystone to Metasys N2
On
On
On
On
On Off Off Off Off Off Off Off
Modbus TCP for all
Off
Off
Off
Off
Off On Off Off Off Off Off Off
Appendix B.1. DIP switch settings to support 1 through 8 Prestige and Keystone to Metasys N2 and
Modbus TCP
Appendix B.
Additional Features
S Bank DIP