Field Controls CK-91FV Скачать руководство пользователя страница 7

page 7 of 8

PRESSURE SWITCH FOR WATER HEATER

1. Follow water heater manufacturer’s instructions to light pilot. Turn the gas control valve to the ON position. 

Then adjust the thermostat to call for heat, which will energize the venter motor. (May see a 1 to 8 sec. 
delay of venter motor)

2. Turn gas control valve to the PILOT position, which will start a 1 to 3 min. post purge of the venter motor.
3. Repeat Step 1 and 2 to ensure proper operation.

SPILLAGE SWITCHES

1. Allow the water heater to heat up to operating temperature, then disconnect the power to the gas pressure 

switch.

2. Adjust the thermostat to call for heat with the venter inoperative. Allow approximately 2 minutes of fl ue gas 

spillage for the spillage switches to sense the spillage and disrupt the thermocouple circuit, halting the gas 
fl ow to the pilot and burner.

3. Wait 2 to 3 minutes. Reset the spillage switches and light the pilot, then perform a second safety spillage 

test (Steps 1 and 2).

CAUTION: If for any reason the system has shut down during operation, the cause of the system failure should 
be investigated and corrected before resetting the safety switch and restarting the system.

P/N 46285300 Rev F 01/18

SYSTEM CONTROL CHECK OUT PROCEDURES

For furnaces or boilers, adjust the thermostat to call for heat and observe the power venting system for proper 
operation sequence. (Repeat if necessary)

1. Thermostat calls for heat.

a. Relay is energized and venter motor starts.
b. Pressure switch closes and burner starts.

c. Thermostat is satisfi ed, the burner stops.

d. This starts the post purge cycle. Purge time 1 to 2 min.

e. While system is operating, disconnect power to the venter motor. This should open the pressure switch 

contacts and stop burner operation.

Diagram C

Содержание CK-91FV

Страница 1: ...D COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION Installation Date Installed By Phone 24 VAC SYSTEM CONTROL KIT Designed for use with the SWG Series Power Venter for controlling Natural Gas or L P...

Страница 2: ...asten the flexible conduit from the SWG Venter into the conduit connector Mount the CK 91FV junction box or installer supplied junction box onto the wall or floor joist without straining the flexible...

Страница 3: ...TION DO NOT use the supplied collar when mounting draft control to Type B Vent Pipe Install by using a Type B Vent Pipe Tee 1 Install a vent pipe reducer or increaser into the inner pipe and fasten us...

Страница 4: ...properly adjust the pressure switch as specified above could lead to improper operation of the pressure switch which will result in a hazardous condition and bodily harm THERMOSTAT HEAT ANTICIPATOR A...

Страница 5: ...ignition module or gas valve if standing pilot which would normally be 24 volts hot on a call for heat With spark ignition systems this terminal could be TH W 24 V THS or T1 depending on the spark ig...

Страница 6: ...Install the GSK spill switches per instruction and connect to the red wire and the thermal door switch per diagram Wire the venter motor and controls in accordance with the National Electrical Code ma...

Страница 7: ...couple circuit halting the gas flow to the pilot and burner 3 Wait 2 to 3 minutes Reset the spillage switches and light the pilot then perform a second safety spillage test Steps 1 and 2 CAUTION If fo...

Страница 8: ...Pressure Switch 46284200 GSK 3 Spillage Switch 46086400 Post Purge Timer 46282800 Pressure Switch 46083000 TCA 1 Thermocouple Adaptor 46082700 REPAIR AND REPLACEMENT PARTS TROUBLE SHOOTING HINTS 1 Ven...

Отзывы: