Field Controls CK-91FV Скачать руководство пользователя страница 5

page 5 of 8

WIRING

CAUTION: Disconnect electrical power when wiring power venter.

Wire  the  venter  motor  and  controls  in  accordance  with  the  National  Electrical  Code,  manufacturer's 
recommendations and/or applicable local codes. 

UNITS MUST BE GROUNDED.

 Check ground circuit to make 

certain  that  the  unit  has  been  properly  grounded.  The  wiring  should  be  protected  by  an  overcurrent  circuit 
device rated at 15 amperes. CAUTION must be taken to ensure that the wiring does not come into contact with 
any heat source. All line voltage and safety control circuits, between the venter and the appliance, MUST be 
wired in accordance with the National Electrical Code for class one wiring or equivalent methods. Route the 
venter motor and control wiring with an appropriate wiring method. Refer to Wiring Diagrams A and B.

LOW VOLTAGE WIRING INSTRUCTIONS FOR BOILERS AND WARM AIR FURNACES

1. With boilers, locate terminal on spark ignition module or gas valve (if standing pilot) which would normally 

be 24 volts hot on a call for heat. With spark ignition systems, this terminal could be TH-W, 24 V, THS or 
T1 depending on the spark ignition control.

2. With warm air furnaces, locate terminal W in furnace junction box.
3. Remove wire from this terminal and reroute to T1 on CK-91F.
4. With boilers, connect T3 on CK-91F to hot side of gas valve (if standing pilot) or to terminal TH-W, 24 V, 

THS or T1 if spark ignition.

NOTE:

 Remember, the correct terminal is the one that would normally be hot on a call for heat.

5. With warm air furnaces, connect T3 on CK-91F to terminal W in furnace junction box.
6. Connect T2 on CK-91F to a 24 volt neutral where convenient.

LINE VOLTAGE WIRING INSTRUCTIONS

1. Connect 120 volts neutral hot power source wire to terminal L1 on CK-91F.

2. Connect  120  volts  neutral  power  source  wire  and  white  wire  from  venter  motor  to  terminal  N  on  the 

CK-91F.

3. Connect black wire from venter motor to terminal M on the CK-91F.

Refer to the SWG Venter installation instructions for setting system airfl ow.

Diagram A

P/N 46285300 Rev F 01/18

Содержание CK-91FV

Страница 1: ...D COMPLETELY BEFORE PROCEEDING WITH THE INSTALLATION Installation Date Installed By Phone 24 VAC SYSTEM CONTROL KIT Designed for use with the SWG Series Power Venter for controlling Natural Gas or L P...

Страница 2: ...asten the flexible conduit from the SWG Venter into the conduit connector Mount the CK 91FV junction box or installer supplied junction box onto the wall or floor joist without straining the flexible...

Страница 3: ...TION DO NOT use the supplied collar when mounting draft control to Type B Vent Pipe Install by using a Type B Vent Pipe Tee 1 Install a vent pipe reducer or increaser into the inner pipe and fasten us...

Страница 4: ...properly adjust the pressure switch as specified above could lead to improper operation of the pressure switch which will result in a hazardous condition and bodily harm THERMOSTAT HEAT ANTICIPATOR A...

Страница 5: ...ignition module or gas valve if standing pilot which would normally be 24 volts hot on a call for heat With spark ignition systems this terminal could be TH W 24 V THS or T1 depending on the spark ig...

Страница 6: ...Install the GSK spill switches per instruction and connect to the red wire and the thermal door switch per diagram Wire the venter motor and controls in accordance with the National Electrical Code ma...

Страница 7: ...couple circuit halting the gas flow to the pilot and burner 3 Wait 2 to 3 minutes Reset the spillage switches and light the pilot then perform a second safety spillage test Steps 1 and 2 CAUTION If fo...

Страница 8: ...Pressure Switch 46284200 GSK 3 Spillage Switch 46086400 Post Purge Timer 46282800 Pressure Switch 46083000 TCA 1 Thermocouple Adaptor 46082700 REPAIR AND REPLACEMENT PARTS TROUBLE SHOOTING HINTS 1 Ven...

Отзывы: