Installation Check List 

 
The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.  
Check with your local inspectors to determine what codes will apply to the installation and operation of FETCO 
products. 
 

1.  Review the Dimensional Drawings and the Operating Procedures for the unit you are installing.  Verify 

the brewer will fit in the space intended for it.  Verify that the counter or table will support the weight of 
the brewer and dispensers when filled and that the surface is level. 
 

2.  Verify that the actual voltage at the electrical service connection is compatible with the specifications on 

the brewer’s serial number plate.  Make sure the electrical service includes 

neutral

.  Ensure at this time 

that the circuit breaker to the brewer and the power switch on the brewer are in the off position. 
 

3.  Remove the white plastic protective coating from the brewer body. 

 

4.  The thermostat, timer, and the water tank fill level are pre-set at the factory.  

There is no need to turn 

off the heaters during the installation process.  The heaters are disabled by the liquid level 
control circuit on the main board until water is sensed.

  The heating process will start automatically 

when the tank has filled with water. 
 

5.  Remove the top and rear panel to inspect for leaks, loose wires, etc., and for adjustments. 

 

6. Water 

connection: 

• 

Water inlet is a 3/8 inch male flare fitting 

• 

We discourage the use of softened water.  Softened water will give poor brew performance in any 
drip tea system using a paper filter. 

• 

Install a water shut off valve near the brewer to facilitate service.  If an in-line water filter is used, it 
should be installed after the water shut off valve and in a position to facilitate filter replacement. 

• 

Flush the water supply line and filter 

before

 connecting it to the brewer. 

• 

Verify that the water line will provide at least 2 gallons per minute, and that the water pressure is 
between 20 and 75 psig. 

• 

Use a wrench on the factory fitting when connecting the incoming water line. This will reduce stress 
on the internal connections and reduce the possibility of leaks developing after the install has been 
completed. 

 

7. Power 

connection: 

• 

A fused disconnect switch or circuit breaker on the incoming power line must be conveniently 
located near the brewer, and its location and markings known to the operators. 

• 

All brewers require 

neutral

.  Damage to the brewer may result if neutral is not present. 

• 

The body of the brewer must be grounded to a suitable building ground.  A ground lug is provided in 
the brewer on the floor of the chassis.  Use suitable gauge copper wire for grounding. 

• 

Electrical connections must be secured in-place within the unit to meet national and local standards. 

 

8.  Turn on the incoming water supply line and inspect both inside and outside of the brewer for leaks in all 

fittings and tubes. 
 

9.  Plug in brewer and turn on the incoming power 

 

10.  Turn on the brewer with the power switch. 

• 

Within 6 seconds, the internal tanks will begin filling until the water is sensed by the water level 
probe.

 

• 

The heaters will be disabled by the L.L.C. circuits on the main board until water is sensed by the 
water probe at the top of the tank.

 

 

Содержание TBS-21H

Страница 1: ...ion Installation Installation Operation Operation Operation Operation Service Service Service Service Model TBS 21H Iced Tea Brewing System Table of Contents Table of Contents Table of Contents Table...

Страница 2: ...typically use a 1 2 ratio one third hot two thirds cold If you have any questions about your new tea brewer please call FETCO at 800 338 2699 or visit our web site at http www fetco com Features Featu...

Страница 3: ...if not installed correctly by qualified personnel the brewer will not operate properly and damage to the brewer may result Damages resulting from improper installation are not covered by the warranty...

Страница 4: ...mance in any drip tea system using a paper filter Install a water shut off valve near the brewer to facilitate service If an in line water filter is used it should be installed after the water shut of...

Страница 5: ...ration of the water shut off valve as well as the circuit breaker for the brewer Never unplug the tea brewer or any high wattage equipment while it is operating Push the power switch to the off positi...

Страница 6: ...rew cycle by pressing the start switch The brew light will illuminate during the brew cycle At the end of the brew cycle the brew light will flash for 4 minutes indicating that hot tea is still drippi...

Страница 7: ...conds in length Examples 1 The factory setting 10 seconds will give 10 seconds of spray over followed by a 20 second pause 2 A setting of 15 seconds will give 15 seconds of spray over followed by a 15...

Страница 8: ...ocate the yellow wire near the lower right side of the control board Move the wire from the terminal labeled START 1 to the terminal labeled START 2 Jumper Settings The control board is used on a vari...

Страница 9: ...ucet complete hot water red 44 00 71023 faucet upper assy hot water red 23 00 71075 faucet complete hot water green 44 00 71076 faucet upper assy hot water green 23 00 71003 faucet seat cup hot water...

Страница 10: ...Drawings Drawings Drawings Drawings 10...

Отзывы: