![Fetco TBS-21H Скачать руководство пользователя страница 3](http://html1.mh-extra.com/html/fetco/tbs-21h/tbs-21h_user-manual_2285239003.webp)
3
Electrical Configurations & Brewing Capacities
Domestic Heater
Maximum
Batches
Model
Configuration
Voltage
Phase
Wires
KW
Amp draw
per Hour**
TBS-21H (-1)
1 X 1500 watt
120
1 ph.
2 + ground
1.6
13.0
2.3
TBS-21H (-2)
1 X 2100 watt
120
1 ph.
2 + ground
2.2
18.0
2.6
TBS-21H (-3)
1 X 2700 watt
120/208
1 ph.
3 + ground
2.1*
10.2*
2.6
120/220
1 ph.
3 + ground
2.4*
11.2*
2.7
120/240
1 ph.
3 + ground
2.8*
11.8*
2.8
TBS-21H (-5)
1 X 3700 watt
120/208
1 ph.
3 + ground
2.9*
13.8*
2.8
120/220
1 ph.
3 + ground
3.3*
15.1*
2.9
120/240
1 ph.
3 + ground
3.8*
15.9*
3.0
*Units with the optional green tea faucet: Add 0.3 KW and 2.5 amps to the figures shown.
(Green tea faucet is not available on 120 volt or export versions.)
Export
Heater
Maximum
Batches
Model
Configuration
Voltage
Phase
Wires
KW
Amp draw
per Hour**
TBS-21H (-4)
1 X 2700 watt
220
1 ph.
2 + ground
2.4
11.2
2.7
TBS-21H (-6)
1 X 3700 watt
220
1 ph.
2 + ground
3.3
15.1
2.9
**Batches per hour are based on standard factory settings: Timer – 12 min. / Pulse – 10 seconds
Installation
Installation
Installation
Installation
(For Qualified Service Technicians Only)
Keys To A Successful Installation
FETCO brewers are rugged and reliable machines that will provide many years of service. However, if not
installed correctly by qualified personnel, the brewer will not operate properly and damage to the brewer may
result. Damages resulting from improper installation are not covered by the warranty.
Here are the key points to consider before installation:
General:
Utilize a qualified beverage equipment service technician for installation.
Place the brewer on a level surface.
Do not adjust the thermostat setting unless absolutely necessary. It is set at the factory for optimum
performance- 205
°
F. It should only be lowered at high altitude installations.
Plumbing:
This equipment is to be installed to comply with the applicable federal, state, or local plumbing codes.
The water line must be flushed thoroughly prior to connecting it to the brewer to prevent debris from
contaminating the machine.
A taste and odor filter is highly recommended for this and all beverage equipment
Verify that the water line will provide at least 2 gallons per minute before connecting it to the brewer.
Electrical:
120 volt units are supplied with appropriate cords and plugs for 15 amp or 20 amp service.
Dual voltage units (120/208-240VAC) are not supplied with a cord or plug. The terminals must be wired as
follows: L-1: 120 VAC
L-2: neutral (white)
L-3: 120 VAC
ground (green)
Both neutral (white) and ground (green) must be provided.
The electrical drawing is located inside the rear cover of the brewer.
Содержание TBS-21H
Страница 10: ...Drawings Drawings Drawings Drawings 10...