Fetco CBS-1150 EXTRACTOR V+ Скачать руководство пользователя страница 11

Go to fetco.com for the latest versions of all information         

Page 11

                                                   

P167  November  2017 

 

 

Installation Guide

 

 

(For Qualified Service Technicians Only) 

 

General:  

1.  If not installed correctly by qualified personnel, the brewer will not operate properly and damage may result. 
2.  Utilize only qualified beverage equipment service technicians for service and installation. 
3.  Always have an empty dispenser under sprayhead of all coffee brewing equipment-including when at idle  
4.  Damages resulting from improper installation are not covered by the warranty, and will void the warranty. 
 

Electrical:  

1.  All FETCO brewers require 

an electrical ground wire

.  Installation without grounding is dangerous. 

2.  Note Equipotentiality Terminal, if present, 

(To identify the terminals which, when connected together, bring the various parts 

of equipment or of a system to the same potential, not necessarily being the earth (ground) potential, e.g. for local bonding.)

 

3.  Verify voltages, polarity, circuits, and circuit breaker access before attaching equipment. 
4.  Brewers in this series wire differently in regards to a neutral wire.  Review the wire diagrams. 
5.  The electrical diagram is located in the Users Guide and online at www.fetco.com. 
6.  Make sure of the tight grounding of the equipment and use the external ground bolt. 
7.  The installation must comply with applicable federal, state, and local codes having jurisdiction at your location.  

Check with your local inspectors to determine what codes will apply. 

See wiring diagrams for connections 

 

Plumbing:  

1.  North America: All installations must comply with applicable federal, state, or local plumbing codes. 
2.  All Others:  The water and waste piping and connections shall comply with the International Plumbing Code 2003, 

International Code Council (ICC), or to the Uniform Plumbing Code 2003 (IAPMO). 

3.  Use an inline water filter for all beverage equipment.   
4.  Install the filter unit after a water shutoff valve and in a position to facilitate filter replacement. 
5.  The water line and newly installed filter cartage must be flushed thoroughly prior to connecting it to the brewer to 

prevent debris from contaminating the machine. 

6.  Verify that the water line will provide a flow rate of at least 1½gpm/(5.7lpm) per minute and the water pressure is 

between 20-75 psig (138-517kPa) before making any connections. 

7.  Use a wrench on the factory fitting when connecting the incoming water line. This will reduce stress on the internal 

connections and reduce the possibility of leaks developing after the install has been completed 

8.  Install a backflow prevention device.  Most municipalities require a recognized backflow preventer.   
Usable on all hot beverage and cold beverage equipment is a WATTS® SD-2 or SD-3.   
WATTS spring loaded double check valve models are accepted by most zoning authorities. 
   

The check valve should be as close to the water supply inlet of the beverage equipment as possible.  

 

Tank Drain 

The water tank must be drained before maintenance procedures, and when the unit is to be relocated or shipped 

 

1. Disconnect  power  and water to unit. DANGER: Insure that all utility connections to the brewer are broken. 
2. Move the unit near a sink or obtain a container large enough to hold four gallons of water.   

Note:  the hot water tank may hold more than four gallons. 

3. Remove the front panel and tank cover and allow the tank to cool to a safe temperature 
4. The tank drain line and clamp are located inside-under the hot water tank.  Pinch the drain line clamp to close 
5. Locate the fill valve against the back wall, using pliers, loosen the hose clamp and move it back over the tube. 

Note Do not losen the hose clamp to the bottom of the hot water tank  

6. Crimp the tube an inch or two away from the drain plug to prevent water from flowing and pull it off the valve.  
7. Pull the tube end out of the brewer and position over sink or bucket. 
8. Release the crimped tube and hose clamp and allow the water to flow into the sink or container. 
9. Multiple buckets may be needed during the draining, see tank volumes below. 

 

Brewer 

Hot Water Tank Capacity 

OPEN 

Leave open for use 

 

PINCH SHUT 

To drain tank & service brewer

 

AI

!

 

CBS-1151 XV+ Single 

6.3 gal 24 liter 

CBS-1152 XV+ Twin 

11.5 gal 44 liter 

 
 

Содержание CBS-1150 EXTRACTOR V+

Страница 1: ...8 F SAVE EXIT 9 Error Codes 9 Operator Training 10 Cleaning Maintenance 10 Installation Guide 11 Parts Diagrams CBS 1151V 14 Parts Diagrams CBS 1152V 16 CBS 1151V Tank Assembly 18 CBS 1152V Tank Assem...

Страница 2: ...e Remove jumper between L2 and L3 and apply power to L3 Specifications and Requirements Water Requirements Coffee Filter Size CBS 1150 XV 20 75 psig 138 517kPa 1 gpm 5 7lpm 15 X 5 standard FETCO F001...

Страница 3: ...llon 6 Liter coffee brewers USA and Canada CBS 1152 XV Field Select Electtical With cUL UL and NSF 4 certification Configuration Codes Heater Configuration Voltage Phase Wires Electrical Connection KW...

Страница 4: ...ettings for the brewer TO ENTER PROGAMMING 1 Turn brewer OFF from power switch 2 Turn power switch to ON Screen will initialize and then display digital process notifications 3 After iitailization Red...

Страница 5: ...ter A2 A5 A3 bottom A3 A6 A1 to A7 B1 0 to B1 7 C1 0 to C1 3 D1 0 to D1 5 E1 0 to E1 8 PROGRAM GENERAL INPUTS OUTPUTS OTHER A_0 Batch Activate A_1 Brew Volume B1 Tank Temp C1 LLC Probe D1 Test L Brew...

Страница 6: ...is feature appears ONLY if Prewet 0 00 A15 This is a Safety Feature Drip Delay 1 30 mm ss 0 30 6 00 Min Time that brew basket remains locked during final drip out Drip delay remains ON for 1 30 minute...

Страница 7: ...94 7 5500 1676 193 201 5 89 94 2 6000 1829 192 200 6 89 93 6 6500 1981 191 199 6 88 93 1 7000 2134 190 198 7 87 92 6 7500 2286 188 197 8 86 92 1 8000 2438 187 196 9 86 91 6 8500 2591 185 196 0 85 91 1...

Страница 8: ...reboot E3 Display Errors Lists up to six codes in order 1 2 3 4 5 6 Newest Last See Error Code Chart for references E4 Reset Errors NO Toggle YES or NO Factory and Service use only Do Not Reset Resett...

Страница 9: ...rvice Restart if still fault reload software If mechanical reassemble correctly NO BSKT Insert Brew Basket Brew basket must be in place This is a SAFETY FEATURE Insert brew basket into brewer rails to...

Страница 10: ...r use abrasives that will scratch surface Weekly 1 Use a commercial coffee dispenser cleaner such as URNEX TABZ DIP IT or Squeak n Clean 2 Carefully Follow the instructions supplied with the cleaning...

Страница 11: ...installed filter cartage must be flushed thoroughly prior to connecting it to the brewer to prevent debris from contaminating the machine 6 Verify that the water line will provide a flow rate of at l...

Страница 12: ...orm to all local electrical and plumbing codes Installation by unqualified personnel will void the unit warranty and may lead to electric shock or burn as well as damage to unit and or its surrounding...

Страница 13: ...able in optional colors Part Number Plug Insert color 1023 00195 00 BROWN PLUG BB HANDLE 1023 00194 00 BLACK PLUG BB HANDLE 1023 00190 00 RED PLUG BB HANDLE 1023 00191 00 GREEN PLUG BB HANDLE 1023 001...

Страница 14: ...5151 1104 00061 01 1401 00147 00 1086 00008 00 E115161 1104 00061 01 1401 00159 00 1086 00031 00 E115162 1104 00096 01 1401 00159 00 1086 00031 00 E115180 1104 00095 01 1401 00152 00 1086 00008 00 E11...

Страница 15: ...10 00 WASHER 10 SCREW W NEOPRENE BONDED SEAL 26 1 1025 00021 00 TUBE 31 32 OD X 5 8 ID X 4 1 4 LG BREW 27 1 1086 00018 00 HEYCO HOSE CLAMP DIA 875 1 00 28 1 1086 00017 00 HEYCO HOSE CLAMP DIA 1 031 1...

Страница 16: ...00008 00 E115261 1101 00339 00 1104 00062 01 1401 00160 00 1086 00031 00 E115262 1101 00339 00 1104 00074 01 1401 00160 00 1086 00031 00 E115280 1101 00339 00 1104 00062 01 1401 00148 00 1086 00008 00...

Страница 17: ...AT AND STEM 26 1 1084 00048 00 JAM NUT 1 2 20 UNF NICKEL PLATED BRASS 27 2 1025 00021 00 TUBE 31 32 OD X 5 8 ID X 4 1 4 LG BREW 28 2 1086 00018 00 HEYCO HOSE CLAMP DIA 875 1 00 29 2 1086 00017 00 HEYC...

Страница 18: ...WELDMENT WATER LEVEL 2 600 LG 11 1 1023 00171 00 FITTING SINGLE BARBED ELBOW 12 2 1107 00037 00 HEATER ASSEMBLY IMMERSION 2300W 240VAC 12 2 1107 00005 00 HEATER ASSEMBLY IMMERSION 3000W 240VAC 12 2 11...

Страница 19: ...2 1023 00171 00 2X FITTING SINGLE BARBED ELBOW 11 1 1024 00007 00 O RING DASH 344 TANK COVER 12 1 1102 00007 00 TANK COVER ASSEMBLY 13 3 1107 00005 00 HEATER ASSEMBLY IMMERSION 3kW 240VAC 13 3 1107 0...

Страница 20: ...C 230 400VAC CE 1 41 20 4 1401 00080 00 E115271 CBS 1152 XV 1or3Ph 3or4 G 3 X 3kW 240VAC 120 208 240VAC E115280 CBS 1152 XV 3Ph 3 G 3 X 3 0kW 240VAC 200VAC J Int 6 5 18 6 1401 00101 00 3 X 3 0 KW E115...

Страница 21: ...Go to fetco com for the latest versions of all information Page 21 P167 November 2017...

Страница 22: ...Go to fetco com for the latest versions of all information Page 22 P167 November 2017 SKU SKU DESCRIPTION KW Amps Wiring Schematic Heaters...

Страница 23: ...0VAC 230VAC CE 1401 00076 00 E115180 CBS 1151 XV 1Ph 2 G 5 0kW 240VAC 200VAC J Int 3 6 17 7 1401 00096 00 1 X 5 0 KW E115190 CBS 1151 XV 1Ph 2 G 4 0kW 240VAC 200 240VAC INTL 4 1 14 2 17 1 1401 00099 0...

Страница 24: ...Go to fetco com for the latest versions of all information Page 24 P167 November 2017...

Отзывы: