![Festo VABF-S4-1-V2B1 series Скачать руководство пользователя страница 14](http://html1.mh-extra.com/html/festo/vabf-s4-1-v2b1-series/vabf-s4-1-v2b1-series_operating-instructions-manual_2282741014.webp)
VABF-S4-1-V2B1...
14
Festo – VABF-S4-1-V2B1... – 1705c English
4
Installation
4.1
Mechanical
1
2
3
4
1
Seal
2
Vacuum block
3
Push-in fitting QS (port 2 – vacuum)
4
Blanking plug (port 4)
Fig. 5
Installation
Secure the vacuum block to the manifold sub-base VABV-S4-1S-G14-2T2 of the valve terminal VTSA
using three screws; tightening torque 2 Nm (±10 %).