5. Maintenance and conversion
5−11
Festo P.BE−CPASC−EN en 0412b
1
Valve location 4
(VP 4)
2
VP 5
3
VP 6
1
2 3
Fig.5/3:
Implementing pressure zones
Preliminary work:
1. Remove the pneumatic screw connector of the relevant
channel (channel 1, 3 or 5) to the right on the base block.
2. Remove the valve plate, after the position of which the
channel is to be separated (in the example on VP 5).
3. In order to facilitate fitting, remove also the valve plate in
front (in the example on VP 4).
Fitting
1. Insert the fixing pin (in Fig.5/2 position
5
) for position
ing the separator element into the appropriate hole of
channel 1, 3 or 5. The relevant holes are marked in black
in the example (Fig.5/3) on VP 4.
Содержание Smart cubic CPA-SC Series
Страница 2: ......
Страница 4: ...Contents and general instructions II Festo P BE CPASC EN en 0412b...
Страница 16: ...Contents and general instructions XIV Festo P BE CPASC EN en 0412b...
Страница 17: ...Summary of components 1 1 Festo P BE CPASC EN en 0412b Chapter 1...
Страница 41: ...Fitting 2 1 Festo P BE CPASC EN en 0412b Chapter 2...
Страница 53: ...Installation 3 1 Festo P BE CPASC EN en 0412b Chapter 3...
Страница 81: ...Commissioning 4 1 Festo P BE CPASC EN en 0412b Chapter 4...
Страница 98: ...4 Commissioning 4 18 Festo P BE CPASC EN en 0412b...
Страница 99: ...Maintenance and conversion 5 1 Festo P BE CPASC EN en 0412b Chapter 5...
Страница 112: ...5 Maintenance and conversion 5 14 Festo P BE CPASC EN en 0412b...
Страница 113: ...Technical appendix A 1 Festo P BE CPASC EN en 0412b Appendix A...
Страница 129: ...Index B 1 Festo P BE CPASC EN en 0412b Appendix B...
Страница 130: ...B Index B 2 Festo P BE CPASC EN en 0412b Contents B Index B 1...
Страница 136: ...B Index B 8 Festo P BE CPASC EN en 0412b W Weights A 4...