2. Commissioning
2-3
Festo P.BE-CTEU-EC-OP+MAINT-EN en 1208NH
2.1
Configuration
General commissioning instructions
Configuration of the higher-order controller demands a very
accurate procedure, as different configuration specifications
are sometimes necessary for each participant, i.e. for each
device and each “box” in the EtherCAT network, due to the
modular structure.
2.1.1 Hot Connect functionality
Hot Connect functionality makes it possible to connect and
disconnect parts of the network during operation. This can be
done by disconnecting/connecting the communication line,
switching the participant on/off, or by other means.
Hot Connect can access this predefined address thanks to the
option of address reservation in the CTEU-EC bus node using
DIL switches (
section 1.4.5).
The first EtherCAT participant after the master should not be
a Hot Connect-configured participant, as this will slow down
link detection at the master.
2.1.2 Registering participant properties (“ESI file”) in the configuration
program
When you place a new EtherCAT participant, i.e. an EtherCAT
device, into operation for the first time, you must inform the
configuration and programming software about certain prop-
erties of the participant.
The properties of the various participants are managed in a
configuration file - the EtherCAT slave information file (ESI
file).
Содержание CTEU-EC
Страница 2: ......
Страница 16: ...Contents and general safety instructions XIV Festo P BE CTEU EC OP MAINT EN en 1208NH...
Страница 17: ...Installation 1 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 1 Installation...
Страница 34: ...1 Installation 1 18 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Страница 35: ...Commissioning 2 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 2 Commissioning...
Страница 44: ...2 Commissioning 2 10 Festo P BE CTEU EC OP MAINT EN en 1208NH Fig 2 3 Activation of tool change mode for slot 1...
Страница 45: ...2 Commissioning 2 11 Festo P BE CTEU EC OP MAINT EN en 1208NH Fig 2 4 Definition of input data here 8 bytes...
Страница 60: ...2 Commissioning 2 26 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Страница 61: ...Diagnostics 3 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Chapter 3 Diagnostics...
Страница 82: ...3 Diagnostics 3 22 Festo P BE CTEU EC OP MAINT EN en 1208NH...
Страница 83: ...Technical appendix A 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Appendix A Technical appendix...
Страница 103: ...Index B 1 Festo P BE CTEU EC OP MAINT EN en 1208NH Appendix B Index...
Страница 104: ...B Index B 2 Festo P BE CTEU EC OP MAINT EN en 1208NH Contents B Index B 1...
Страница 109: ...B Index B 7 Festo P BE CTEU EC OP MAINT EN en 1208NH U User instructions X X X1 X2 LEDs 3 6...
Страница 110: ...B Index B 8 Festo P BE CTEU EC OP MAINT EN en 1208NH...