![Ferroli TP3 LN 1060 Скачать руководство пользователя страница 30](http://html1.mh-extra.com/html/ferroli/tp3-ln-1060/tp3-ln-1060_instruction-for-use-installation-and-assembly_2282127030.webp)
30
EN
TP3 LN
cod. 3545458/0 - 10/2019
1. INTRODUCTION ......................................................................................................................................................................... 31
2. GENERAL WARNINGS .............................................................................................................................................................. 31
3. CERTIFICATION ......................................................................................................................................................................... 31
4. TECHNICAL AND CONSTRUCTIONAL CHARACTERISTICS, DIMENSIONS ........................................................................ 31
4.1
Description of the appliance ........................................................................................................................................................................ 31
4.2
Operating principle ....................................................................................................................................................................................... 32
4.3
Technical data - Dimensions - Hydraulic connections ................................................................................................................................. 33
4.4
Identification
................................................................................................................................................................................................. 34
5. INSTALLATION .......................................................................................................................................................................... 34
5.1
Packaging .................................................................................................................................................................................................... 34
5.2
Handling ....................................................................................................................................................................................................... 34
5.3
Boiler room (Fig. 5) ...................................................................................................................................................................................... 35
5.4
Discharge of combustion products (Fig. 6) .................................................................................................................................................. 36
5.5
Hydraulic connections .................................................................................................................................................................................. 36
5.5.1
Supply water .......................................................................................................................................................................................... 36
5.5.2
Central heating outlet/return pipes ......................................................................................................................................................... 36
5.5.3
System fill/drain pipe
.............................................................................................................................................................................. 36
5.5.4
Pipes, expansion vessel and safety valves ............................................................................................................................................ 37
5.5.5
Recirculation pump (Fig. 7) .................................................................................................................................................................... 37
5.6
Opening and adjusting the front door .......................................................................................................................................................... 37
5.7
Assembling the burner (Fig. 9) .................................................................................................................................................................... 38
5.8
Connecting the flame inspection window (Fig. 10)
...................................................................................................................................... 39
5.9
Assembling the panels, models 92÷190 ...................................................................................................................................................... 39
5.10 Assembling the panels, models 240÷2360 .................................................................................................................................................. 40
6. COMMISSIONING ...................................................................................................................................................................... 41
6.1
Preliminary checks ....................................................................................................................................................................................... 41
6.2
First ignition ................................................................................................................................................................................................. 41
6.3
Shutting down the boiler .............................................................................................................................................................................. 41
7. MAINTENANCE .......................................................................................................................................................................... 41
7.1
General instructions ..................................................................................................................................................................................... 41
7.2
Routine maintenance ................................................................................................................................................................................... 41
7.3
Special maintenance ................................................................................................................................................................................... 42
7.4
Cleaning the boiler ...................................................................................................................................................................................... 42
7.5
Checking boiler operation ............................................................................................................................................................................ 42
7.6
Checking burner operation .......................................................................................................................................................................... 43
7.7
Troubleshooting ........................................................................................................................................................................................... 43
Содержание TP3 LN 1060
Страница 64: ...64 RU TP3 LN cod 3545458 0 10 2019 5 3 5 TP3 LN 1300 90 R x Q 500 600 600 1000 X 1000 5...
Страница 70: ...70 RU TP3 LN cod 3545458 0 10 2019 6 6 1 5 5 5 6 2 160 6 3 7 O C BAH E 7 1 7 2...
Страница 71: ...71 RU TP3 LN cod 3545458 0 10 2019 7 3 7 4 1 2 3 4 5 6 7 5 1 13 14 5 4 6 1 3 2 5 4 6 1 3 2...
Страница 72: ...72 RU TP3 LN cod 3545458 0 10 2019 30 2 3 7 6 7 7...
Страница 73: ......
Страница 74: ......
Страница 75: ......