![FEICHTNER LEIMO Скачать руководство пользователя страница 10](http://html1.mh-extra.com/html/feichtner/leimo/leimo_operation-manual_548747010.webp)
Operation Manual Universal Gluing Press “LEIMO”
10
Release 10/2017 – We reserve the right to make technical changes in the interests of further development
Gramsham 2 · D-84550 Feichten/Alz
Phone +49- 86 23 - 70 35 · Fax +49-86 23 - 70 36
[email protected]
www.feichtner-maschinenbau.de
1) Place the left and right side parts with the foot tube inside.
2) Now screw the lower longitudinal tube (80/49/2000) with the right side part as shown.
Assembling
3) In addition, screw one of the two delivered brackets on the left side part.