5 Inspection
- 28 -
Operation after the rolling blackouts
1.
Confirm that the UPS is connected to an input power supply and the connection
device.
The RUN LED (green) on the front of the UPS blinks slowly (in the cycles of
approximately 1.6 sec.).
2.
Press the RUN/STOP switch on the front of the UPS for approximately 1 second.
The buzzer will sound if the switch is received.
3.
AC voltage is outputted from the output terminal block, and the RUN LED (green) on
the front of the UPS lights up.
4.
Turn on the connection device if the normal operation is started.
For details, refer to Chapter 4.1 "Turning on the UPS".
When a warning beep sounds:
Refer to Chapter 6.1 "If a Warning Beep Sounds".
Содержание M-UPS050AD2B
Страница 3: ......