![Fayat Dynapac DFP9 Скачать руководство пользователя страница 79](http://html1.mh-extra.com/html/fayat/dynapac-dfp9/dynapac-dfp9_operating-instruction-maintenance-instruction_546868079.webp)
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Park the machine in secured condition
‘Parking the machine in secured condition’ on page 61
2.
Let the engine cool down to 20 °C (68 °F).
3.
Unscrew the fastening screws (1).
4.
Remove valve cover (2) with seal (3).
5.
Set the piston to the top dead centre position of the compres-
sion stroke.
For this purpose align the alignment mark (2) on the starter
disc to the top bore (1).
Valve clearance:
Intake valve (IN)
0.08 mm (0.003 in)
Exhaust valve (EX)
0.10 mm (0.004 in)
1.
Check the valve clearance with a feeler gauge between
rocker arm (2) and valve shaft (1) on both valves, adjust if
necessary.
Preparations
Fig. 67
Fig. 68
Checking the valve clearance
Fig. 69
Maintenance – Annually
DFP9
79
Содержание Dynapac DFP9
Страница 6: ...Table of contents DFP9 6 ...
Страница 7: ...1 Introduction Introduction DFP9 7 ...
Страница 11: ...2 Technical data Technical data DFP9 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DFP9 15 ...
Страница 39: ...4 Indicators and control elements Indicators and control elements DFP9 39 ...
Страница 45: ...5 Checks prior to start up Checks prior to start up DFP9 45 ...
Страница 52: ...Checks prior to start up Checking the water level topping up DFP9 52 ...
Страница 53: ...6 Operation Operation DFP9 53 ...
Страница 63: ...7 Loading transporting the machine Loading transporting the machine DFP9 63 ...
Страница 67: ...8 Maintenance Maintenance DFP9 67 ...
Страница 97: ...9 Troubleshooting Troubleshooting DFP9 97 ...
Страница 103: ...10 Disposal Disposal DFP9 103 ...
Страница 105: ......
Страница 106: ......