8.4 Running-in instructions
8.4.1 General
The following maintenance work must be performed when running
in new machines or overhauled engines.
8.4.2 After 25 operating hours
1.
Change the engine oil
Chapter 8.7.1 ‘Changing the engine
.
2.
Check engine and machine for leaks.
3.
Retighten the fastening screws on air filter, exhaust and other
attachments.
4.
Retighten the bolted connections on the machine.
5.
Checking the V-belt
Chapter 8.9.4 ‘Servicing the V-belt’
6.
Check the oil level in the vibrator housing.
Maintenance – Running-in instructions
DFP9
72
Содержание Dynapac DFP9
Страница 6: ...Table of contents DFP9 6 ...
Страница 7: ...1 Introduction Introduction DFP9 7 ...
Страница 11: ...2 Technical data Technical data DFP9 11 ...
Страница 15: ...3 Concerning your safety Concerning your safety DFP9 15 ...
Страница 39: ...4 Indicators and control elements Indicators and control elements DFP9 39 ...
Страница 45: ...5 Checks prior to start up Checks prior to start up DFP9 45 ...
Страница 52: ...Checks prior to start up Checking the water level topping up DFP9 52 ...
Страница 53: ...6 Operation Operation DFP9 53 ...
Страница 63: ...7 Loading transporting the machine Loading transporting the machine DFP9 63 ...
Страница 67: ...8 Maintenance Maintenance DFP9 67 ...
Страница 97: ...9 Troubleshooting Troubleshooting DFP9 97 ...
Страница 103: ...10 Disposal Disposal DFP9 103 ...
Страница 105: ......
Страница 106: ......