n
Track length
Measured track length between START and STOP.
n
Raster division in longitudinal direction
Is used to pinpoint individual measuring values on the measuring
curve.
The raster lines mark measuring track sections of 5 m
length.
Graduation of the measuring track (track length in printout) into
fixed sections.
n
Marking of jump information
Indicates excessive jumping/tumbling of the drum on the marked
track section (thick line).
Select a smaller amplitude, if necessary!
n
Longitudinal raster line
n
Measuring value raster line
n
Diagram line
Shows the E
VIB
-value at any point of the rolled track. The raster line
enables the location related assignment of the E
VIB
-value and the
location of a fault (over or under compaction).
n
Marking of jump information
Indicates jumping of the drum on the marked track section (thin
line).
Indicators and Controls
BW 213 D-4
52
Содержание BOMAG BW 213 D-4
Страница 2: ...2 ...
Страница 6: ...Table of contents BW 213 D 4 6 ...
Страница 7: ...1 Foreword Foreword BW 213 D 4 7 ...
Страница 10: ...Fig 2 Fig 3 Foreword BW 213 D 4 10 ...
Страница 11: ...2 Technical Data Technical Data BW 213 D 4 11 ...
Страница 15: ...3 Safety regulations Safety regulations BW 213 D 4 15 ...
Страница 29: ...4 Indicators and Controls Indicators and Controls BW 213 D 4 29 ...
Страница 30: ...Fig 8 Indicators and Controls BW 213 D 4 30 ...
Страница 49: ...4 5 Line diagram EVIB only BTM prof Fig 41 Indicators and Controls BW 213 D 4 49 ...
Страница 53: ...5 Operation Operation BW 213 D 4 53 ...
Страница 92: ...Operation BW 213 D 4 92 ...
Страница 93: ...6 Maintenance Maintenance BW 213 D 4 93 ...
Страница 117: ...NOTICE Check the V belt tension after a running time of 30 minutes Maintenance BW 213 D 4 117 ...
Страница 153: ...7 Trouble shooting Trouble shooting BW 213 D 4 153 ...
Страница 157: ...Press key ESC Ä Fig 200 to leave the screen page with the actual fault codes Trouble shooting BW 213 D 4 157 ...
Страница 161: ...8 Cab assembly before initial start up Cab assembly before initial start up BW 213 D 4 161 ...
Страница 174: ...Cab assembly before initial start up BW 213 D 4 174 ...
Страница 175: ...9 Disposal Disposal BW 213 D 4 175 ...
Страница 177: ......
Страница 178: ......