8.2 Preparations/concluding work
Certain maintenance tasks require preparations and concluding
activities.
This includes e.g. opening and closing maintenance flaps and
maintenance doors as well as securing certain components.
After this work close all maintenance flaps and doors again and
return all components to their operating condition.
8.2.1 Opening / closing the protection hood
8.2.1.1
Opening the protection hood
Protective equipment:
n
Working clothes
n
Protective gloves
1.
Remove the rear screws (2) on both sides of the machine.
2.
Put the screws (2) and the matching washers to the side.
3.
Loosen the front screws (1) on both sides.
4.
Fold the protection hood forward.
5.
Secure the protection hood against accidental closing.
For this tighten the screw (1) on both sides.
Fig. 52
Fig. 53
Maintenance – Preparations/concluding work
DRP70D
65
Содержание DYNAPAC DRP70D
Страница 2: ...2...
Страница 6: ...Table of contents DRP70D 6...
Страница 7: ...1 Introduction Introduction DRP70D 7...
Страница 11: ...2 Technical data Technical data DRP70D 11...
Страница 15: ...3 Concerning your safety Concerning your safety DRP70D 15...
Страница 40: ...Concerning your safety Signage DRP70D 40...
Страница 41: ...4 Indicators and control elements Indicators and control elements DRP70D 41...
Страница 45: ...5 Checks prior to start up Checks prior to start up DRP70D 45...
Страница 51: ...6 Operation Operation DRP70D 51...
Страница 58: ...Operation Parking the machine in secured condition DRP70D 58...
Страница 59: ...7 Loading transporting the machine Loading transporting the machine DRP70D 59...
Страница 62: ...Loading transporting the machine Lashing the machine to the transport vehicle DRP70D 62...
Страница 63: ...8 Maintenance Maintenance DRP70D 63...
Страница 99: ...9 Troubleshooting Troubleshooting DRP70D 99...
Страница 109: ...10 Disposal Disposal DRP70D 109...
Страница 111: ......
Страница 112: ......