
Operation
40
4812325556EN
08/01/2023
Ballast box
Water and wet sand ballast
Remove the top covers (1) and fill with water and sand through
this opening.
Keep the side covers (2) closed during the water filling.
Do not remove the draining plugs (3) because the water may
leak when the ballast is filled with it.
Fill the ballast box, when necessary, with gravel, sand and steel.
The water shall be added when it is filled with sand, so it can fill
all the spaces between the ballast.
When using the roller with mixed ballast, start using
the steel objects available, and then add the
requisite amount of sand and water
Distribute the ballast evenly.
Fig.
– Ballast box cover
1.
Top forward covers
2.
Side covers
3.
Draining plugs
Содержание CP1200
Страница 2: ......
Страница 4: ...4812325556EN 08 01 2023...
Страница 15: ...Safety decals description and location 08 01 2023 4812325556EN 11 Safety decals description and location...
Страница 85: ......