![Fayat Group BOMAG BW 900-50 Скачать руководство пользователя страница 116](http://html1.mh-extra.com/html/fayat-group/bomag-bw-900-50/bomag-bw-900-50_service-manual_546898116.webp)
9.5
Bleeding the travel circuit
BOMAG
120
008 921 86
9.5
Bleeding the travel circuit
Environment
Catch hydraulic oil and dispose of environ-
mentally.
1. Secure the drums with chocks .
2. Actuate the emergency stop switch.
!
Danger
The engine should not start.
3. Install a pressure test hose to the charge pres-
sure test port.
4. Install a pressure test hose each to the high pres-
sure test ports.
5. Hold the open ends of the pressure test hoses
(Fig. 3) into a container.
6. Operate the starter motor for approx. 30 seconds.
Wait one minute and repeat this procedure, until
oil starts to run out from the pressure test hoses.
7. Remove the pressure test hoses.
Fig. 1
Fig. 2
Fig. 3
Go
to
Discount-Equipment.com
to
order
your
parts
Содержание BOMAG BW 900-50
Страница 3: ...G o t o D i s c o u n t E q u i p m e n t c o m t o o r d e r y o u r p a r t s ...
Страница 46: ...BOMAG 49 008 921 86 6 Engine G o t o D i s c o u n t E q u i p m e n t c o m t o o r d e r y o u r p a r t s ...
Страница 118: ...BOMAG 123 008 921 86 10 Drum G o t o D i s c o u n t E q u i p m e n t c o m t o o r d e r y o u r p a r t s ...
Страница 148: ...BOMAG 156 008 921 86 G o t o D i s c o u n t E q u i p m e n t c o m t o o r d e r y o u r p a r t s ...
Страница 166: ...BOMAG 176 008 921 86 G o t o D i s c o u n t E q u i p m e n t c o m t o o r d e r y o u r p a r t s ...