![Fayat Group Bomag BVP 10/36 Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/fayat-group/bomag-bvp-10-36/bomag-bvp-10-36_operating-instructions-manual_3704389035.webp)
Maintenance
BOMAG
35
BVP 10/36, BVP 18/45
5.4
Running-in instructions
The following maintenance work must be per-
formed when running in new machines or
overhauled engines:
!
Caution
During the running-in period, up to approx. 200
operating hours, check the engine oil level
twice every day.
Depending on the load the engine is subjected
to, the oil consumption will drop to the normal
level after approx. 100 to 200 operating hours.
After 25 operating hours
l
Change the engine oil.
l
Check engine and machine for leaks.
l
Check the valve clearance, adjust if necessary
l
Retighten the fastening screws on air filter ex-
haust, fuel tank and other attachments.
l
Retighten the bolted connections on the ma-
chine.
l
Check the vibration drive V-belts.
l
Check the oil level in the vibrator housing.
*Always follow manufacturer instructions*
*AAA Rent-All 225-291-1356*
Содержание Bomag BVP 10/36
Страница 2: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 23: ...BOMAG 23 BVP 10 36 BVP 18 45 4 Operation Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 31: ...BOMAG 31 BVP 10 36 BVP 18 45 5 Maintenance Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 58: ...Trouble shooting BOMAG 58 BVP 10 36 BVP 18 45 Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 59: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 60: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...