![Fayat Group Bomag BVP 10/36 Скачать руководство пользователя страница 27](http://html1.mh-extra.com/html/fayat-group/bomag-bvp-10-36/bomag-bvp-10-36_operating-instructions-manual_3704389027.webp)
Operation
BOMAG
27
BVP 10/36, BVP 18/45
Fig. 20
l
Pull the rope by the starter handle quickly and
powerful as far out as possible (Fig. 20).
!
Caution
Do not let the starter handle hit back against
the engine.
l
If the engine does not start during the first at-
tempt, repeat the starting process.
Fig. 21
l
As the engine warms up open the lever (Fig.
21) of the choke bit by bit.
Fig. 22
l
Move the throttle lever (Fig. 22) back to idle
speed position.
l
Run the engine warm for approx. 1 to 2 min-
utes in idle speed.
i
Note
Operation of the vibratory plate can be started as
soon as the engine responds to short throttle com-
mands.
!
Caution
When the engine is running leave the ignition
switch in position "I".
Fig. 23
l
If the engine stops again after approx. 3 to 5
seconds, close the choke again with the lever
(Fig. 23) and repeat the starting process.
*Always follow manufacturer instructions*
*AAA Rent-All 225-291-1356*
Содержание Bomag BVP 10/36
Страница 2: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 23: ...BOMAG 23 BVP 10 36 BVP 18 45 4 Operation Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 31: ...BOMAG 31 BVP 10 36 BVP 18 45 5 Maintenance Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 58: ...Trouble shooting BOMAG 58 BVP 10 36 BVP 18 45 Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 59: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...
Страница 60: ...Always follow manufacturer instructions AAA Rent All 225 291 1356...