FASTORA NAST2 Server Hardware Installation Guide
C h a p t e r 3
Starting the Appliance
Complete the installation by switching on the appliance, the power-on diagnostics run
automatically. Each time the appliance is switched on; it runs a self-testing program to ensure that
it is running correctly. After the power-on diagnostics running, the
FASTORA NAST2
server starts
to load the application and is ready for use.
3.1 Hardware installation before starting the appliance
Before starting the appliance, you need to finish the hardware Installation. Please follow the
following steps. (Review the chapter 2 for detail.)
Step 1:
Install HDD via hot-swappable drive tray to the drive bay. Note that All HDDs must be
set to master or cable select mode
Step 2:
Connect the cable of Ethernet. Switched on the appliance after AC power cords are
connected
Step 3:
The Yellow system LED is continuously at diagnostics status about 2 seconds, then the
green system LED flash rapidly (one flash per 0.5 second) at the appliance is booting.
Step 4:
The continuous green LED means the appliance is ready.
Step 5:
Finish the hardware installation.
Starting the Appliance
11
Содержание Fastora NAS T2
Страница 1: ...FASTORA NAST2 Hardware Installation Guide For service person only...
Страница 6: ...This page does not contain any information vi...
Страница 11: ...FASTORA NAST2 Server Hardware Installation Guide 1 4 Dimensions Unit mm Introduction 5...
Страница 22: ...This page does not contain any information 16...
Страница 24: ...This page does not contain any information 18...