a D:GROUP Company
00254EN – Rev. 01 – 11/2012
4
2 INSTALLATION
2.A INSTRUCTIONS AND CHECKS ON DELIVERY
Considering the critical nature of the use of the ASEPTIC isolator and the need to keep it in optimum
condition, installation is very important.
ASEPTIC isolators are positioned on a pallet wrapped in an extensible film and contained in a package of
multi-layer strapped cardboard or a wooden cage.
After placing the isolator in its site of use, opened the package and removed the extensible film, check that
the equipment has not suffered any dents or scratches due to transport or improper handling of the package.
In case of any further transport, packing and storage by the user after the initial period of use (e.g. change of
laboratory or factory), contact the technical assistance service or the distributor for more accurate and
precise instructions or for assistance by specialized technicians.
ASEPTIC isolators, with or without package, should be always located in a room sheltered from rain.
2.B INSTALLATION REQUIREMENTS
Install the isolator away from drafts and heat sources (radiators, ventilators/convectors), to ensure proper
functioning.
Install the isolator in a well-ventilated room with a low degree of dust.
Place the isolator away from doors and windows, which may cause malfunctions
Place the isolator in places where there is little human traffic.
The door of the room should be in such a position relative to the isolator as to prevent drafts.
Min. temperature
5 °C
Max. temperature:
40 °C
Max. humidity:
80% at 31 °C, linear drop in relative humidity down to 50% relative humidity
at 40°C.
Before connecting the isolator to the mains power supply, check the necessary voltage and power indicated
on the plate near the power cable. The room must be equipped with an earth connection.
The quantity of heat generated by the isolator, is the following:
ASEPTIC 2-4-2
180 W
These heat value must be added to the heat generated by any instrument (e.g. connected to internal socket
or tap) used by the client in the work chamber.
ATTENTION: the installation must be done by technicians authorized by Faster S.r.l. or by the
official distributor.
Содержание ASEPTIC
Страница 45: ...a D GROUP Company 00254EN Rev 01 11 2012 45 13 IDIAGRAM FOR MAINTENANCE OPERATIONS...
Страница 46: ...a D GROUP Company 00254EN Rev 01 11 2012 46...
Страница 47: ...a D GROUP Company 00254EN Rev 01 11 2012 47 13 J FRONTAL DIAGRAM...
Страница 48: ...a D GROUP Company 00254EN Rev 01 11 2012 48 13 K SIDE DIAGRAM...
Страница 49: ...a D GROUP Company 00254EN Rev 01 11 2012 49 14 SUPPORT TABLE...
Страница 52: ...a D GROUP Company 00254EN Rev 01 11 2012 52 17 WIRING DIAGRAM ASEPTIC EQUIPPED WITH CLARUS L 2...
Страница 53: ...a D GROUP Company 00254EN Rev 01 11 2012 53...
Страница 54: ...a D GROUP Company 00254EN Rev 01 11 2012 54...
Страница 55: ...a D GROUP Company 00254EN Rev 01 11 2012 55...
Страница 56: ...a D GROUP Company 00254EN Rev 01 11 2012 56...
Страница 57: ...a D GROUP Company 00254EN Rev 01 11 2012 57...
Страница 58: ...a D GROUP Company 00254EN Rev 01 11 2012 58...
Страница 59: ...a D GROUP Company 00254EN Rev 01 11 2012 59...
Страница 60: ...a D GROUP Company 00254EN Rev 01 11 2012 60 18 WIRING DIAGRAM ASEPTIC EQUIPPED WITH STERIS VHP...
Страница 61: ...a D GROUP Company 00254EN Rev 01 11 2012 61...
Страница 62: ...a D GROUP Company 00254EN Rev 01 11 2012 62...
Страница 63: ...a D GROUP Company 00254EN Rev 01 11 2012 63...
Страница 64: ...a D GROUP Company 00254EN Rev 01 11 2012 64...
Страница 65: ...a D GROUP Company 00254EN Rev 01 11 2012 65...
Страница 66: ...a D GROUP Company 00254EN Rev 01 11 2012 66...
Страница 67: ...a D GROUP Company 00254EN Rev 01 11 2012 67...