Use a pop rivets to mount the bracket to the 1
st
drilled hole.
11.
With 1 pop rivet installed, drill the remaining 3 holes and install their pop rivets.
12.
Repeat the process on the inside face of the clean grain elevator. Take care to ensure
the ¾” hole is drilled directly across from the other (using the same x,y measurements).
Repeat the process on the inside face of the clean grain elevator. Take care to ensure the ¾”
hole is drilled directly across from the other (using the same x,y measurements).
If access to the back of the clean grain elevator is restricted, you can create a sheet metal
drilling template for the sensor pilot hole (for the harvester’s specific X dimension) and use an
angled drill to drill the pilot and sensor holes.