Showing routing of Primary Cable along inside of door post. Ignition switch assembly removed
for access.
9.
Once the Primary Cable has been routed outside of your cab, use the supplied zip ties to
route it over to the clean grain elevator. Leave a few feet of cable loose by the clean
grain elevator to attach to the interconnect cable.