background image

23

GROWSPAN

 GOTHIC PRO GREENHOUSES AND SYSTEMS

Revision date: 06.07.18

a.  Photo shows the end cap as attached to the door 

frame tube. View shows the assembly from the 

outside.

b.  Cross section shows the end cap (dashed line) 

attached to the inside/back of the door frame.

11.  At the top and sides of the end wall door opening on 

the inside of the frame, attach end cap and allow it to 

extend below and into the door frame opening. 

 

ATTENTION:

 This profile acts as a stop for the double 

doors, which prevents undo stress on the hinges. 

Consult the photos that follow.

c.  Dashed line identifies where to attach the end cap 

profile. The end cap extends beyond the frame 

members and into the rough opening to stop the 

door in the frame and to help seal the gap between 

the door and frame.

End cap used for 

door stop and seal.

Diagram may show a different frame used for illustration 

purposes only.

Door Frame 

Tube

End Cap 

(#104548)

DOUBLE DOOR ASSEMBLY (continued)

12. After end cap profile is installed, install another section 

of the same end cap on the 

inside frame of the door 

that includes the chain latch. 

 

Diagram may show a different frame used for illustration 

purposes only.

NOTE:

 This length of end cap will act as a stop for the 

remaining door of the double door assembly when both 

doors are closed.

13. Check the operation of the latches and the doors.
14. Continue by installing the polycarbonate roof panels.

10. Install the 6" chain bolt to the upper part of the inside 

of one door and the main latch assembly to the other 

door.

Inside 

View

Outside 

View

Содержание Growers supply GrowSpan 106306PC

Страница 1: ...different but similar model STK DIMENSIONS 106306PC 26 W x 12 H x 28 L 106307PC 26 W x 12 H x 36 L 106308PC 26 W x 12 H x 48 L 106309PC 26 W x 12 H x 72 L 2018 Growers Supply All Rights Reserved Repr...

Страница 2: ...er location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never...

Страница 3: ...Install main roof panels 13 Read the care and maintenance information in next column POLYCARBONATE PANELS Do not allow panels to remain in direct sunlight with protective film in place Doing so will c...

Страница 4: ...parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult the Pictorial Parts Guide and all diagrams for clarification or contact Customer Serv...

Страница 5: ...Connector 104074 Square to Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 104624 Square Tube Fitting QH1330 Angle Bracket 104213 Aluminum U Channel Profile 104548 En...

Страница 6: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 7: ...e joints as guides when installing the end clamps cross connectors and purlins Purlins Ground Post GrowSpan Gothic Pro Greenhouses and Systems OVERVIEW See illustration below to identify main parts of...

Страница 8: ...round post 6 Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if n...

Страница 9: ...are set onto the ground posts 1 Select the five 5 pipes needed to assemble the first end rafter and arrange on a level surface 2 Slide four 4 end purlin clamps two on each side of the peak over the r...

Страница 10: ...urate spacing of the rafter assemblies is achieved and maintained during assembly Gather the Parts Pipe 1 315 x 75 Swaged 131S075 Pipe 1 315 x XX Plain 131P0XX Marker and Tape Measure NOTE The purlins...

Страница 11: ...Cross Connector 102548 5 16 x 2 1 2 Machine Bolts and 5 16 Nuts Lifts ladders and assistants Rope or cable 1 Carefully stand the first end rafter slide a band clamp onto each rafter leg and place the...

Страница 12: ...on the purlin with the center of the rafter to maintain the proper spacing Interior Rafter Align mark with center of rafter Purlin 11 Verify that the rafter spacing is forty eight inches 48 on center...

Страница 13: ...are set and all purlins are in place and secure return to each pipe splice of each purlin and verify that a Tek screw is installed Install a Tek screw if needed 22 Remove any temporary bracing if nee...

Страница 14: ...tallation instructions for the accessories if equipped or measure the width of the accessory to accurately space and position the end frame tubes Consult the panel installation diagrams in the Quick S...

Страница 15: ...wall The base tube consists of 99 swaged tubes and one 1 short section cut from a 102897 square tube See Quick Start section for clarification 2 Insert the swaged ends of the tubing into the plain end...

Страница 16: ...r 14 With the square to round tube connect bracket attached to the top of each vertical door frame tube use the bolt in the band clamp to attach the bracket to the band clamp DO NOT TIGHTEN AT THIS TI...

Страница 17: ...these clamps 23 Using the end frame diagrams Quick Start section measure and mark on the base tube the locations of the remaining vertical end wall supports 24 Choose the parts for each remaining vert...

Страница 18: ...umb and use the short Tek screws to secure the square tube fitting to the base tube Center Mark 30 Tighten the top band clamp and install a short Tek screw through the clamp and into the rafter 31 Rep...

Страница 19: ...ional double door is not used Consult the end frame diagram for additional information 1 Read the note regarding the installation of optional accessories at the beginning of the end wall installation...

Страница 20: ...Consult the Polycarbonate Panels diagrams Quick Start section for the location and lengths of each panel The diagrams are located at the back of these instructions ATTENTION Panels must be position as...

Страница 21: ...the polycarbonate panels as described for the front and back end walls ATTENTION U channel profile is installed along the edges of the panels shown in the diagram below Cut upper panel to proper lengt...

Страница 22: ...inum U Channel profile Corners are cut at 45 angles To keep the panel and profile in place the long Tek screws and neo bonded galvanized washers are installed so the screw drills through the longer ed...

Страница 23: ...to the rough opening to stop the door in the frame and to help seal the gap between the door and frame End cap used for door stop and seal Diagram may show a different frame used for illustration purp...

Страница 24: ...el by six 6 inches 3 Install ridge cap 4 Repeating Steps 1 3 work toward other end of frame until all panels and ridge cap sections are installed 5 Attach aluminum profile to lower edge of upper panel...

Страница 25: ...side and remove protective film NOTE Mark UV protected side using a piece of tape or other means to ensure side is installed toward the sun 2 Apply vent tape 104774 to cover one end of panel 3 Move t...

Страница 26: ...align check that rafters are spaced at 48 on center from ground post along one side to those on opposite side Adjust rafters as needed Duct tape can be used in small pieces to hold H channel in place...

Страница 27: ...from top Review diagrams below for another way to install lower panels a After installing lower panels of first frame bay prepare the next lower panel as previously described but do not attach any H c...

Страница 28: ...and outside the frame carefully set panel on frame and overlap top of lower panel by 6 17 Align panel and center H channel with center of end rafter and first interior rafter 18 Secure panel to rafte...

Страница 29: ...ach ridge cap to 104548 end cap using FA4484B Tek screws and 102921 neo bonded washers Repeat to secure remaining side of ridge cap 104548 end cap cut to fit between rafters inside frame Tek screw and...

Страница 30: ...per panels Solid line shows lower end of all upper panels dashed line shows upper edge of all lower panels which is capped with foil tape during panel preparation X X Step 24 25 Step 26 A IMPORTANT BE...

Страница 31: ...f 1 5 x 1 5 tube Diagram shows installed panels as seen standing inside greenhouse 4 From inside the frame align square tube as shown over lower end of upper panel dashed line Hold tube in place tight...

Страница 32: ...page ATTENTION If you are not installing a baseboard skip to and continue by sealing greenhouse using the supplied silicone sealant View from outside of the shelter Upper Panel Installed 104213 U Cha...

Страница 33: ...e of Shelter After installing all panels installing baseboards is strongly recommended Minimum size is 2 x 6 Length determined by building length Materials for baseboards are supplied by the customer...

Страница 34: ...U channel 2 Seal seams between H channel and ends of U channel 4 Seal upper edge of both end walls with a bead of sealant See dashed line in diagram below Frame shown may differ from actual frame 5 Se...

Страница 35: ...tion Remove debris and objects that accumulate on greenhouse Use tools that will not damage panels cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage...

Страница 36: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 36 Revision date 06 07 18 QUICK START GUIDE 26 Gothic Pro Greenhouse Frame shown may differ in length from actual frame...

Страница 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...

Страница 38: ...AND SYSTEMS 38 Revision date 06 07 18 SIDE PROFILE 106306PC Baseboards Supplied by Customer 28 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0495 4 Runs of Pipe Assembly Use...

Страница 39: ...AND SYSTEMS Revision date 06 07 18 SIDE PROFILE 106307PC Baseboards Supplied by Customer 36 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 4 Runs of Pipe Assembly...

Страница 40: ...40 Revision date 06 07 18 SIDE PROFILE 106308PC 48 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 4 Runs of Pipe Assembly Used for Purlin runs 131S075 131S075 131S075 Ba...

Страница 41: ...e 06 07 18 SIDE PROFILE 106309PC Baseboards Supplied by Customer 72 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 131S075 131S075 131S075 131S075 131S075 131S075...

Страница 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...

Страница 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...

Страница 44: ...L 48 C L C L 22 7 8 C L C L 22 7 8 C L C L 48 C L C L 25 1 8 C L C L VIEW 1 VIEW 3 VIEW 2 NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAM...

Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION END WALL DETAILS...

Страница 46: ...25 1 8 C L C L 47 15 16 C L C L 25 1 8 C L C L 22 7 8 C L C L 48 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FUL...

Страница 47: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 48: ...LS FRONT VIEW EXCESS TRIMMED AND USED HERE EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY 4 X 8 POLY ONE HALF 4 X 8 POLY ONE HALF 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY...

Страница 49: ...8 POLYCARBONATE PANELS BACK VIEW EXCESS TRIMMED AND USED HERE EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 PO...

Страница 50: ...USES AND SYSTEMS 50 Revision date 06 07 18 MAIN COVER DETAILS R a f t e r H C h a n n e l P o l y c a r b P o l y c a r b 1 0 4 2 1 3 104213 4 6 Overlap Cut this panel from a 116050 Panel 47 1 4 x 120...

Страница 51: ...51 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 Page reserved for customer notes...

Отзывы: