13
GROWSPAN
™
GOTHIC PRO GREENHOUSES AND SYSTEMS
Revision date: 06.07.18
18. Secure the purlin pipe joint with a Tek screw.
19. Repeat the above steps as needed to stand and secure
the remaining interior rafters and purlins to complete
the frame assembly.
20. Slide a band clamp onto each leg of the remaining
end rafter, secure the rafter to the ground posts, and
attach the purlins to it. Verify that the end clamps are
positioned with the nut and bolt to the inside of the
assembled frame. Refer to the Quick Start section and
previous diagrams if needed.
NOTE:
If the last end rafter is plumb and the purlin
extends beyond the end of the rafter, cut the last
section of purlin pipe to the required length.
FRAME ASSEMBLY (continued)
Dashed line shows
ground level.
Frame length may differ from actual frame.
21. Once all rafters are set and all purlins are in place and
secure, return to each pipe splice of each purlin and
verify that a Tek screw is installed. Install a Tek screw if
needed.
22. Remove any temporary bracing (if needed) and install
the struts.
SIDE STRUT INSTALLATION
There are four (4) side struts (#QH1304) for shelter. Struts
are positioned at first rafter space at each end.
Gather parts:
• 5' Struts (#QH1304)
• Short Tek screws (#FA4482B)
Complete these steps to install the four (4) side struts:
1. Locate one strut and secure to the previously attached
band clamps as shown in the diagrams below.
NOTE:
Heads of bolts on band clamps to face toward
outside of shelter.
2. Repeat above step to attach remaining side struts.
3. After securing struts, verify all clamps are secured with
a Tek screw to rafter.
4. Complete the following to anchor greenhouse frame.
QH1304
Strut
End Rafter
Interior
Rafter
Customer-supplied
baseboard—installed
after roof cladding
installation.
Ground Level
A
B
Strut
Interior
Rafter
Band
Clamp
Strut
End
Rafter
Band
Clamp
A
B
Содержание Growers supply GrowSpan 106306PC
Страница 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...
Страница 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...
Страница 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...
Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION END WALL DETAILS...
Страница 51: ...51 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 Page reserved for customer notes...