INTERIOR RAFTER ASSEMBLY
Complete the following steps 

for the interior rafters

1.  Select the pipes for the first interior rafter assembly and 

position these on the ground as shown. 

 

(#26G166SS401D)

(#166S099)

(#26G166SS403)

IMPORTANT:

 Interior rafters do not use end clamps. 

Instead, cross connectors are attached during the 

frame assembly.

2.  Insert the swaged ends of the rafter pipes into the plain 

ends of the pipes and secure each joint with a Tek 

screw. 

 

NOTE:

 For longer frames, it may be easier to assemble 

a few rafters at a time and then begin to assemble the 

frame.

3.  Once rafters are assembled, assemble the frame.

FRAME ASSEMBLY

After all ground posts are driven in place and rafters are 

assembled, assemble the frame. 

NOTE: 

The baseboards (strongly recommended) shown in 

the diagrams throughout these instructions are not included 

and must be supplied by the customer.

 

Contact Customer service at 1-800-245-9881 to purchase 

baseboards, or for additional information. 

ASSEMBLE AND PRE-MARK THE PURLINS 

The following steps describe one way to speed the 

assembly process and eliminate the need to measure each 

purlin as it is installed. Pre-marking the purlins ensures that 

an accurate spacing of the rafter assemblies is achieved 

and maintained during assembly. 

Gather the Parts:
•  Pipe 1.315'' x 75'' Swaged (#131S075)
•  Pipe 1.315'' x XX'' Plain (#131P0XX)
•  Marker and Tape Measure

 

NOTE:

 The purlins are part of the assembled frame and 

run perpendicular to the rafter assemblies. Each purlin 

consists of 1.315" x 75" (#131S075) swaged pipes (number 

is determined by shelter length) and one (1) 1.315" x XX" 

(#131P0XX) plain pipe. 

 

ATTENTION:

 The XX" represents the remaining length 

required to reach the end of the shelter. Consult the Spec 

Sheet for part identification.
1.  Select the required pipe sections for one purlin and 

connect these by inserting the swaged ends of the 

pipes into the plain ends until the entire purlin is 

assembled. 

 

NOTE:

 Assemble the purlins in a location that is 

accessible during the assembly of the frame, but will 

not interfere with the process of lifting and setting the 

rafters.

2.  Verify that each pipe joint is properly seated. 

 

NOTE:

 These pipes must be separated during the 

assembly procedure. Do not fasten them together at 

this time.

3.  For the 48" rafter spacing, measure forty-eight and 

three-quarters inches (48-3/4") from one end of the 

assembled purlin and mark the distance on the pipe. 

 

NOTE:

 This first measurement is three-quarters (3/4) 

of an inch longer than the on-center rafter spacing 

to account for the length of purlin pipe that extends 

through the end purlin clamp of the first end rafter.

RAFTER ASSEMBLY (continued)

Содержание Growers supply GrowSpan 106306PC

Страница 1: ...different but similar model STK DIMENSIONS 106306PC 26 W x 12 H x 28 L 106307PC 26 W x 12 H x 36 L 106308PC 26 W x 12 H x 48 L 106309PC 26 W x 12 H x 72 L 2018 Growers Supply All Rights Reserved Repr...

Страница 2: ...er location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never...

Страница 3: ...Install main roof panels 13 Read the care and maintenance information in next column POLYCARBONATE PANELS Do not allow panels to remain in direct sunlight with protective film in place Doing so will c...

Страница 4: ...parts listed on the Bill of Materials Spec Sheets are present If anything is missing or you have questions consult the Pictorial Parts Guide and all diagrams for clarification or contact Customer Serv...

Страница 5: ...Connector 104074 Square to Round Tube Connect Bracket 102856 End Clamp FAH009B FALB01B Carriage Bolt Hex Nut 104624 Square Tube Fitting QH1330 Angle Bracket 104213 Aluminum U Channel Profile 104548 En...

Страница 6: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 7: ...e joints as guides when installing the end clamps cross connectors and purlins Purlins Ground Post GrowSpan Gothic Pro Greenhouses and Systems OVERVIEW See illustration below to identify main parts of...

Страница 8: ...round post 6 Repeat the same step for the last corner post NOTE The distance measured diagonally between corner posts must be equal for the building to be square 7 Check all dimensions and adjust if n...

Страница 9: ...are set onto the ground posts 1 Select the five 5 pipes needed to assemble the first end rafter and arrange on a level surface 2 Slide four 4 end purlin clamps two on each side of the peak over the r...

Страница 10: ...urate spacing of the rafter assemblies is achieved and maintained during assembly Gather the Parts Pipe 1 315 x 75 Swaged 131S075 Pipe 1 315 x XX Plain 131P0XX Marker and Tape Measure NOTE The purlins...

Страница 11: ...Cross Connector 102548 5 16 x 2 1 2 Machine Bolts and 5 16 Nuts Lifts ladders and assistants Rope or cable 1 Carefully stand the first end rafter slide a band clamp onto each rafter leg and place the...

Страница 12: ...on the purlin with the center of the rafter to maintain the proper spacing Interior Rafter Align mark with center of rafter Purlin 11 Verify that the rafter spacing is forty eight inches 48 on center...

Страница 13: ...are set and all purlins are in place and secure return to each pipe splice of each purlin and verify that a Tek screw is installed Install a Tek screw if needed 22 Remove any temporary bracing if nee...

Страница 14: ...tallation instructions for the accessories if equipped or measure the width of the accessory to accurately space and position the end frame tubes Consult the panel installation diagrams in the Quick S...

Страница 15: ...wall The base tube consists of 99 swaged tubes and one 1 short section cut from a 102897 square tube See Quick Start section for clarification 2 Insert the swaged ends of the tubing into the plain end...

Страница 16: ...r 14 With the square to round tube connect bracket attached to the top of each vertical door frame tube use the bolt in the band clamp to attach the bracket to the band clamp DO NOT TIGHTEN AT THIS TI...

Страница 17: ...these clamps 23 Using the end frame diagrams Quick Start section measure and mark on the base tube the locations of the remaining vertical end wall supports 24 Choose the parts for each remaining vert...

Страница 18: ...umb and use the short Tek screws to secure the square tube fitting to the base tube Center Mark 30 Tighten the top band clamp and install a short Tek screw through the clamp and into the rafter 31 Rep...

Страница 19: ...ional double door is not used Consult the end frame diagram for additional information 1 Read the note regarding the installation of optional accessories at the beginning of the end wall installation...

Страница 20: ...Consult the Polycarbonate Panels diagrams Quick Start section for the location and lengths of each panel The diagrams are located at the back of these instructions ATTENTION Panels must be position as...

Страница 21: ...the polycarbonate panels as described for the front and back end walls ATTENTION U channel profile is installed along the edges of the panels shown in the diagram below Cut upper panel to proper lengt...

Страница 22: ...inum U Channel profile Corners are cut at 45 angles To keep the panel and profile in place the long Tek screws and neo bonded galvanized washers are installed so the screw drills through the longer ed...

Страница 23: ...to the rough opening to stop the door in the frame and to help seal the gap between the door and frame End cap used for door stop and seal Diagram may show a different frame used for illustration purp...

Страница 24: ...el by six 6 inches 3 Install ridge cap 4 Repeating Steps 1 3 work toward other end of frame until all panels and ridge cap sections are installed 5 Attach aluminum profile to lower edge of upper panel...

Страница 25: ...side and remove protective film NOTE Mark UV protected side using a piece of tape or other means to ensure side is installed toward the sun 2 Apply vent tape 104774 to cover one end of panel 3 Move t...

Страница 26: ...align check that rafters are spaced at 48 on center from ground post along one side to those on opposite side Adjust rafters as needed Duct tape can be used in small pieces to hold H channel in place...

Страница 27: ...from top Review diagrams below for another way to install lower panels a After installing lower panels of first frame bay prepare the next lower panel as previously described but do not attach any H c...

Страница 28: ...and outside the frame carefully set panel on frame and overlap top of lower panel by 6 17 Align panel and center H channel with center of end rafter and first interior rafter 18 Secure panel to rafte...

Страница 29: ...ach ridge cap to 104548 end cap using FA4484B Tek screws and 102921 neo bonded washers Repeat to secure remaining side of ridge cap 104548 end cap cut to fit between rafters inside frame Tek screw and...

Страница 30: ...per panels Solid line shows lower end of all upper panels dashed line shows upper edge of all lower panels which is capped with foil tape during panel preparation X X Step 24 25 Step 26 A IMPORTANT BE...

Страница 31: ...f 1 5 x 1 5 tube Diagram shows installed panels as seen standing inside greenhouse 4 From inside the frame align square tube as shown over lower end of upper panel dashed line Hold tube in place tight...

Страница 32: ...page ATTENTION If you are not installing a baseboard skip to and continue by sealing greenhouse using the supplied silicone sealant View from outside of the shelter Upper Panel Installed 104213 U Cha...

Страница 33: ...e of Shelter After installing all panels installing baseboards is strongly recommended Minimum size is 2 x 6 Length determined by building length Materials for baseboards are supplied by the customer...

Страница 34: ...U channel 2 Seal seams between H channel and ends of U channel 4 Seal upper edge of both end walls with a bead of sealant See dashed line in diagram below Frame shown may differ from actual frame 5 Se...

Страница 35: ...tion Remove debris and objects that accumulate on greenhouse Use tools that will not damage panels cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage...

Страница 36: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 36 Revision date 06 07 18 QUICK START GUIDE 26 Gothic Pro Greenhouse Frame shown may differ in length from actual frame...

Страница 37: ...37 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 FRONT PROFILE...

Страница 38: ...AND SYSTEMS 38 Revision date 06 07 18 SIDE PROFILE 106306PC Baseboards Supplied by Customer 28 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0495 4 Runs of Pipe Assembly Use...

Страница 39: ...AND SYSTEMS Revision date 06 07 18 SIDE PROFILE 106307PC Baseboards Supplied by Customer 36 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 4 Runs of Pipe Assembly...

Страница 40: ...40 Revision date 06 07 18 SIDE PROFILE 106308PC 48 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 4 Runs of Pipe Assembly Used for Purlin runs 131S075 131S075 131S075 Ba...

Страница 41: ...e 06 07 18 SIDE PROFILE 106309PC Baseboards Supplied by Customer 72 0 Shelter Length 4 0 Rafter Spacing 131S075 131S075 131S075 131S075 131P0735 131S075 131S075 131S075 131S075 131S075 131S075 131S075...

Страница 42: ...GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS 42 Revision date 06 07 18 CONNECTIONS...

Страница 43: ...43 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION FRAME DETAILS...

Страница 44: ...L 48 C L C L 22 7 8 C L C L 22 7 8 C L C L 48 C L C L 25 1 8 C L C L VIEW 1 VIEW 3 VIEW 2 NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAM...

Страница 45: ...45 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 CONNECTION END WALL DETAILS...

Страница 46: ...25 1 8 C L C L 47 15 16 C L C L 25 1 8 C L C L 22 7 8 C L C L 48 C L C L NOTE COLUMNS NOT DIMENIONED HAVE A NON CRITICAL PLACEMENT AND ARE USED FOR POLYCARBONATE SUPPORT ALL END FRAMING TUBES ARE FUL...

Страница 47: ...l does not allow channel side out installation Use the diagrams on this page to install H channel with flat side facing out ATTENTION Use only 1 1 2 Tek screws to attach H channel to building frame Do...

Страница 48: ...LS FRONT VIEW EXCESS TRIMMED AND USED HERE EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY 4 X 8 POLY ONE HALF 4 X 8 POLY ONE HALF 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY...

Страница 49: ...8 POLYCARBONATE PANELS BACK VIEW EXCESS TRIMMED AND USED HERE EXCESS TRIMMED AND USED HERE 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 8 POLY 4 X 10 PO...

Страница 50: ...USES AND SYSTEMS 50 Revision date 06 07 18 MAIN COVER DETAILS R a f t e r H C h a n n e l P o l y c a r b P o l y c a r b 1 0 4 2 1 3 104213 4 6 Overlap Cut this panel from a 116050 Panel 47 1 4 x 120...

Страница 51: ...51 GROWSPAN GOTHIC PRO GREENHOUSES AND SYSTEMS Revision date 06 07 18 Page reserved for customer notes...

Отзывы: