12
12
115554 Revision date: 01.27.20
9
Install Bulkhead Screen and Extensions
INSTALL BULKHEAD SCREENS AND EXTENSIONS
Photo above shows the bulkhead screens and extensions installed in
both bulkheads.
Photo above shows the bulkhead screen and extension installed in one
bulkhead. A screen without the extension is installed in the other.
111303
111302
Bulkhead screens and extensions allow you to manage nutrient solution level in the tray.
Screens can be used with or without extensions. Depending on the application, extensions can
be used with one screen on the drain tube to increase and maintain the nutrient solution level
in the tray. A screen installed on the pump tube deflects water to ensure an even, steady flow.
Install these items as needed to achieve the desired results.
Hand-tighten only during installation to allow for easier removal.
TEST AND USE EBB & FLOW SYSTEM
After assembly, fill reservoir to desired level. Cover entire pump with water. Connect pump to power and test system. Adjust flow and drain rates as desired.
Adjust frame as needed so tray drains properly. Review Section 9 to set water level in tray. After checking pump and drain operation, read the instructions
sent with the timer and connect it to the system. Set watering cycles according to timer instructions. The ebb and flow system is ready to use.