BEGIN TO ASSEMBLE THE SHELTER

.

Thank you for purchasing this FarmTek® shelter. When 

properly assembled and maintained, this product will  

provide years of reliable service. These instructions include 

helpful hints and important information needed to safely 

assemble and properly maintain the shelter. Please read 

these instructions 

before

 you begin.

If you have any questions during the assembly, contact 

Customer Service for assistance.

SAFETY PRECAUTIONS

•  Wear eye protection.
•  Wear head protection.
•  Wear gloves when handling metal tubes.
•  Use a portable GFCI (Ground Fault Circuit Interrupter) 

when working with power tools and cords.

•  Do not climb on the shelter or framing during or after  

construction.

•  Do not occupy the shelter during high winds,  

tornadoes, or hurricanes.

•  Provide adequate ventilation if the structure is  

enclosed.

•  Do not store hazardous materials in the shelter.
•  Provide proper ingress and egress to prevent  

entrapment.

ANCHORING INSTRUCTIONS

Prior to assembling this shelter, please read the 

MUST 

READ

 document included with the shipment. 

 WARNING:

 The anchor assembly is an integral part of 

the shelter construction. Improper anchoring may  

cause shelter instability and failure of the structure. 

Failing to anchor the shelter properly 

will void the 

manufacturer’s warranty

 and may cause serious injury 

and damage.

LOCATION

Choosing the proper location is an important step before 

you begin to assemble the structure.  

The following suggestions and precautions will help you  

determine whether your selected location is the best  

location. 
•  Never erect the structure under power lines.
•  Identify whether underground cables and pipes are  

present 

before

 preparing the site or anchoring the    

structure.

•  Location should be away from structures that could  

cause snow to drift on or around the building.

•  Do not position the shelter where large loads such as 

snow and ice, large tree branches, or other overhead 

obstacles could fall.

SITE

After choosing a location, proper preparation of the site is 

essential. Follow the information below.
• 

A level site is required

. The site must be level to  

properly and safely erect and anchor the structure.

•  For sites that are not concrete or gravel, placing wood  

blocks or other suitable supports under each rafter leg 

helps prevent the pipes from sinking or working into the 

site.

• 

Drainage: Water draining off the structure and from 

 

areas surrounding the site should drain away from the  

site to prevent damage to the site, the structure, and  

contents of the structure.

 WARNING:

 The individuals assembling this structure 

are responsible for designing and furnishing all  

temporary bracing, shoring and support needed during 

the assembly process. For safety reasons, those who 

are not familiar with recognized construction methods 

and techniques must seek the help of a qualified  

contractor.

Содержание 104299

Страница 1: ...HICK INN Revision date 12 19 07 Chick Inn Coops Photo may show a different but similar model 2007 FarmTek All Rights Reserved Reproduction is prohibited without permission STK DIMENSIONS 104299 12 W x 18 L ...

Страница 2: ...r s warranty and may cause serious injury and damage LOCATION Choosing the proper location is an important step before you begin to assemble the structure The following suggestions and precautions will help you determine whether your selected location is the best location Never erect the structure under power lines Identify whether underground cables and pipes are present before preparing the site...

Страница 3: ...ough the following definitions before you begin to assemble your shelter Conduit An assembly of pipes used to secure the main cover and end panels if equipped Purlins and some strut assemblies also consist of connected pipes to form a conduit Each pipe joint of a conduit assembly is secured with a self tapping Tek screw Coupler or Fitting A part of the frame assembly where legs purlins and rafter ...

Страница 4: ...tape optional and supplied by customer Box cutter or utility knife UNPACK AND IDENTIFY PARTS The following steps will ensure that you have all the necessary parts before you begin to assemble the shelter 1 Unpack the contents of the shipment and place where you can easily inventory the parts Refer to the Bill of Materials Spec Sheets 2 Verify that all parts listed on the Bill of Materials Spec She...

Страница 5: ...d show you how they are used Not all parts are shown 102192 4 Way Coupler 102191 3 Way Coupler FA4470B Tek Screw QH1061 Ratchet 103620b Plain End Strap Swaged Pipe End Plain Pipe End Swaged and plain pipe ends used to show the difference Pipe shape may differ from actual pipe used for the shelter 100442 Nut Setter ...

Страница 6: ...yebolts install the Tek screws at each pipe connection for additional security if desired WARNING To prevent personal injury and damage to the shelter fasten and tighten a Tek screw at each pipe and coupler joint To prevent cover damage install the Tek screw so that it does not touch the main cover or any optional side or end panels once these are installed ADDITIONAL PARTS IDENTIFICATION NOTES In...

Страница 7: ...iew of the process for assembling your Chick Inn Coop See illustration below to identify main parts of shelter 1 Locate the required parts for each assembly procedure 2 Assemble the rafters and frame and square frame 3 Anchor the shelter 4 Prepare and attach main cover NOTE Not all ratchets are shown attached to the frame ...

Страница 8: ...efer to diagram Using multiples of 3 4 5 such as 6 8 10 or 12 16 20 helps to maintain an accurate 90 angle 4 After squaring the position of the building and placing a stake at all corners string a line between the stakes to mark the base of the building RAFTER ASSEMBLY Gather the parts Pipes 1 315 x 78 Plain 131P078 Pipes 1 315 x 72 Plain 131P072 3 Way Couplers 102191 4 Way Couplers 102192 Rafter ...

Страница 9: ...ED SQUARE THE ASSEMBLED FRAME Gather the parts Measuring tape Complete these steps 1 With the frame in position perform a final square of the frame by measuring diagonally corner to corner shown below at the bottom of the legs and verify that the two measurements are equal Adjust if needed 2 Adjust width Measure width from center of rafter leg to center of other rafter leg of the same rafter assem...

Страница 10: ...ecure each pipe joint with a Tek screw and wrap the joint with duct tape supplied by customer Repeat this step for the remaining conduit These cover conduits are inserted into pockets in the cover and are used to tighten and secure the cover 2 After assembling the cover conduits locate the cover and unfold it along the side of the frame NOTE When handling the cover and setting it in position do no...

Страница 11: ...en ratchets to the outside of these rafters using Tek screws 12 Cut a slit through the main cover pocket at the rafter position where the ratchets are installed Insert a 3 section of strap though the slit and around the cover conduit for each ratchet 13 Thread the strap ends into a ratchet and slightly tighten NOTE It may be necessary to remove excess strap if it binds up in the ratchet 14 Repeat ...

Страница 12: ...se tools that will not damage the cover when removing debris Remove snow to prevent excess accumulation Use tools that will not damage the cover when removing snow Check the contents of the shelter to verify that nothing is touching the cover or the side panels that could cause damage Check the anchoring system to ensure that all components are tight and in good repair If the shelter is moved insp...

Страница 13: ...13 CHICK INN Revision date 12 19 07 Space below is reserved for customer notes ...

Отзывы: