8.3.1 Machine Unfolding Procedure
Machine Unfolding Procedure – Work Position
Initial condition:
The machine SF4,5–6PS lifted on axle, side frames secured by locking
drawbar, piston-rods of the side rollers are inserted and both ball valves on
the drawbar are closed.
The machine SF4P lifted on axle, piston-rods of the roller are ejected and
ball valve on the drawbar is closed.
1
SF4,5–6PS
Disassemble locking drawbar and
position it to the draught pole.
Open both ball valves located on
the drawbar.
SF4P
Open ball valve on the drawbar.
SF4,5–6PS
Unfold the machine by means of
red circuit.
2
SF4,5–6PS
Use the yellow circuit to eject the
piston-rods of the side rollers to
the end position, i. e. maximum
ejection.
SF4P
Check that the piston-rods are
ejected to the end position, ie.
maximum ejection.
SF4P, SF4,5–6PS
Insert the axle piston rods to limit
position, i. e. maximum inserted
position, by means of the green
circuit. The machine is uniformly
laid onto all rollers.
SF4P, SF4,5–6PS
Position appropriate number of
distance washers to the roller
piston rods (acc. to required recess
of machine). If the machine is
equipped with a drawbar for fixed
suspension,
set
the
distance
washers also on the drawbar piston
rods. Insert piston rods of all rollers
(drawbar) by means of the yellow
circuit. Now the machine is ready
for operation.
24
|
44
Содержание SOFTER 4P
Страница 2: ...2 44 Prepared by Technical Department Farmet a s on 31 01 2022 changes reserved...
Страница 4: ...PREFACE 4 44 IMPORTANT READ CAREFULLY BEFORE USE KEEP FOR FUTURE REFERENCE...
Страница 6: ...PREFACE 6 44...
Страница 15: ...WORK SAFETY LABELS Fig 1 Location of safety labels on the machine 15 44...
Страница 44: ...SERVICING AND WARRANTY CONDITIONS 44 44...