
USE AND MAINTENANCE MANUAL - SECTION 4
AERIAL PLATFORM PKS 1200E-920-720 - Rev 02_2016
Page 4-13
Lifting/lowering work platform
After having selected the movement mode of the work platform, move the
cloche forward/backward to move the work platform up/down.
NOTE:
The cloche acts proportionally on work platform movement speed.
The movement power is applied in proportion to the movement of the
cloche from the centre.
PRESS THE DEAD MAN ENABLING
CONTROL ON THE CLOCHE, then
push the cloche in the required
direction of movement.
Indicator LED
The indicator LED's switch on both after a function has been activated by
means of the "work platform run/movement" selector and after an alarm has
been triggered (also signalled by an intermittent buzzer).
The possible alarm conditions are indicated below:
Содержание PKS 1200E
Страница 27: ...USE AND MAINTENANCE MANUAL SECTION 3 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 3 5 1 1 2 6 3 4 5...
Страница 72: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 5 2 5 7 4 10 13 13...
Страница 75: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 8...
Страница 77: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 10...
Страница 78: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 11...
Страница 85: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 18...
Страница 86: ...NOTES...
Страница 87: ...Page left intentionally blank...