USE AND MAINTENANCE MANUAL - SECTION 3
AERIAL PLATFORM PKS 1200E-920-720 - Rev 02_2016
Page 3-4
(g) Control console of the work platform
– Controls, signs, securely
fastened and legible, emergency stop switch in the reset position for
operation, legible control signs;
(h) Ground control station
– Main power supply selection switch
working, signs securely fastened and legible, emergency stop switch
operation;
(i) Extendible structure unit
– Structure profiles, sliding inserts,
chains, sequential activation cables, pulleys able to turn freely.
Figure key symbols, as follows:
1.
Drive wheels/free wheels and adjustable wheels
2.
Base frame
3.
Engine/pump/tank/battery unit
4.
Manually extendable work platform unit
5.
Work platform control console
6.
Manual descent control valve
7.
Ground control station
8.
Upright unit (extendible structure)
9.
Main power switch
Содержание PKS 1200E
Страница 27: ...USE AND MAINTENANCE MANUAL SECTION 3 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 3 5 1 1 2 6 3 4 5...
Страница 72: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 5 2 5 7 4 10 13 13...
Страница 75: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 8...
Страница 77: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 10...
Страница 78: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 11...
Страница 85: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 18...
Страница 86: ...NOTES...
Страница 87: ...Page left intentionally blank...