USE AND MAINTENANCE MANUAL - SECTION 4
AERIAL PLATFORM PKS 1200E-920-720 - Rev 02_2016
Page 4-3
Battery charging procedure
1. Park the machine in a well-ventilated area, near an a.c. electric
socket;
2. Switch the machine off by pushing the emergency stop on the control
console of the work platform and remove the enabling key;
3. Connect the battery charger to a correctly installed socket and
earthed according to current regulations.
Battery charge status lights
The
RED LED
, indicating the battery charging phase, flashes twice and then
stays on (the red LED on indicates the charging phase).
Charging finishes automatically without warning the operator, and is
indicated by a
GREEN LED
coming on.
Содержание PKS 1200E
Страница 27: ...USE AND MAINTENANCE MANUAL SECTION 3 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 3 5 1 1 2 6 3 4 5...
Страница 72: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 5 2 5 7 4 10 13 13...
Страница 75: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 8...
Страница 77: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 10...
Страница 78: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 11...
Страница 85: ...USE AND MAINTENANCE MANUAL SECTION 7 AERIAL PLATFORM PKS 1200E 920 720 Rev 02_2016 Page 7 18...
Страница 86: ...NOTES...
Страница 87: ...Page left intentionally blank...